Section 232 Steel and Aluminum Tariffs: Managing Duty Exposure

A daylit steel service-centre warehouse with a row of large rolled steel coils on timber cradles, stacked aluminium extrusions and ingots behind them, and one coil marked by a single pink band.
“I would start every Section 232 review with the parts list, because a part with no heading, metal weight or melt record on file carries a duty nobody on the buying side can check.”
— Stan Moskovtsev, Co-Founder & U.S. CEO
Dated rules and findings behind this guide
StatisticSource
CBP FAQs, last modified November 17, 2026: filers can report OTH when the melt-and-pour country of derivative steel is unknown.CBP Section 232 FAQs, 2026
Commerce, October 14, 2026: under Proclamation 11032’s Annex I-C USMCA rule, U.S. content includes the value of U.S.-melted steel and U.S.-smelted aluminum.Commerce U.S.-content guidance, 2026
Commerce, August 6, 2026, a proposal: duties on 14 more derivative articles, comments due August 27, 2026.Commerce request for comments, 2026
Proclamation 11032, June 1, 2026: Annex I-C goods pay 25% from June 8, 2026 to December 31, 2027 unless a lower rate applies.Proclamation 11032, 2026
Proclamation 11021, April 2, 2026: domestic capacity utilization about 50.4 percent for aluminum and 77.2 percent for steel, against about 39 and 72.3 percent in 2017.Proclamation 11021, 2026
AER: Insights, 2021: tariffs imposed from 2018, on goods including aluminum and steel, passed through almost fully to U.S. import prices.Cavallo, Gopinath, Neiman and Tang, 2021

One dated statement per row, newest first; check current texts before relying on a row.

Additional Section 232 rates on the full customs value, steel and aluminum goods, entries from June 8, 2026
  • Annex I-A: steel, aluminum and some derivatives50%
  • UK goods in Annex I-A, UK-melted or UK-cast metal25%
  • Annex I-B: other listed derivatives25%
  • Annex I-C mobile equipment, through Dec 31, 202725%
  • UK goods in Annex I-B, UK-melted or UK-cast metal15%
  • I-A or I-B derivatives, U.S.-melted or smelted10%
  • Under 15% metal weight, outside ch. 72-74 and 760%

On top of normal duties, as read November 21, 2026. UK rates need at least 95% UK-melted or cast metal (CBP); U.S.-metal rates at least 85% by weight. Not shown: Russian aluminum at 200%, combined 15% floors, USMCA and column 2 rules. Source: Proclamation 11021, 2026; Proclamation 11032, 2026; CBP CSMS 68855869, 2026.

What are Section 232 steel and aluminum tariffs, and what changed in 2026?

Under Proclamation 11021 of April 2, 2026, the duty applies from April 6, 2026 to the full customs value of covered metal articles and derivatives, regardless of metal content. According to the same proclamation, Annex I-A goods pay 50% and Annex I-B goods 25%, with 25% and 15% for UK products whose metal is entirely UK-melted or UK-cast and 10% for derivatives with entirely U.S. metal, while aluminum goods that are Russian products, contain any primary aluminum smelted in Russia or were cast there stay at 200%.

Some 2025 headings used a narrower base: under CBP’s message CSMS 65936570 of August 15, 2025, the duty on the steel derivative headings it listed fell on the value of the steel content. Re-base any 2025 cost model or pass-through formula built on metal-content value onto full entered value for entries from April 6, 2026.

According to CBP’s guidance message CSMS 68253075 of April 3, 2026, goods listed for more than one metal pay one rate only, and annex goods outside chapters 72, 73, 74 and 76 with less than 15 percent of the applicable metals by weight pay none. Under that guidance, such goods are reported under heading 9903.82.03 at 0%, with the metal weight in kilograms as a second quantity, and Russian aluminum lines at 200% may not use that heading.

Under Proclamation 11032 of June 1, 2026, Annex I-C goods, its temporary tier for mobile industrial equipment and machinery, pay 25% from June 8, 2026 to December 31, 2027 unless a lower rate applies. According to that proclamation, the lower rates are a combined 15% for listed partners, a combined 10% for entirely U.S. metal, and 25% on non-U.S. content only for qualifying USMCA goods, with at least 15 percent in total. Confirm with your broker how the partner heading is filed.

According to the same June proclamation, agricultural equipment and some residential HVAC joined fixed industrial machinery and power equipment in a reduced 15 percent tier. According to CBP’s guidance message CSMS 68855869 of June 5, 2026, that tier brings an article with a column 1 rate under 15 percent up to 15% and adds nothing at 15 percent or more for entries before January 1, 2028, when its goods move to the 25% heading, or to the 15% UK and 10% U.S.-metal headings where they apply.

How do you map Section 232 exposure by part number?

Split spend by who imports before mapping: your own imports, supplier imports sold to you delivered duty paid, domestic converters using imported coil, bar or billet, and domestic-melt material with no entry, which should carry no Section 232 duty line. As importer of record you hold the evidence and your trade compliance lead or broker decides the claim; ask supplier-importers for the same evidence before accepting a surcharge.

Start your own imports from the broker’s entry summaries, not supplier descriptions. According to CBP’s Section 232 FAQs, last modified November 17, 2026, only HTS codes defined in the presidential proclamations should be reported for additional duty, so check each code against the annexes rather than its chapter. Record each part’s ten-digit number as filed, its annex, the Chapter 99 heading and its current rate, checked against CBP’s latest message.

Have suppliers print on each invoice or packing-list line your part number, the country of origin, the melt-and-pour or smelt-and-cast countries and the metal and total weights, plus the U.S. ten-digit HTS number they expect, which the broker confirms before filing. For new parts and re-sourcing, get the broker’s classification before award.

Then test weight: according to CBP’s April 3, 2026 guidance, the 15 percent calculation counts only the metals that annex IV specifies for the part’s classification, so in CBP’s example a subheading listed as both an aluminum and a steel derivative counts both metals but not copper. Let the broker apply the rule to the weights suppliers give.

Estimate each part’s duty by tier, and have the broker confirm it on a sample entry per heading. For flat rates, including the Annex I-A and I-B UK and U.S.-metal rates, multiply the rate by entered value; for combined tiers, take 15% or 10% minus the column 1 rate, never below zero, times entered value; for qualifying USMCA goods in Annex I-C, take 25% of non-U.S. content, never under 15% of entered value. Flag parts near 15 percent metal by weight, with metal from several countries, or with a heading that differs from the entry.

A proposed Section 232 exposure register, one row per imported part
FieldWhat to recordEvidence to holdReview when
ClassificationTen-digit number as filed and the annex that lists itEntry line; broker’s written viewNew rule or CBP message
Origin and preferenceCountry of origin of the article; any preference claimed, such as USMCACertificate of origin or supplier statementSupplier or routing change
Importer and termsImporter of record and IncotermContract and entryContract change
DutyChapter 99 heading, column 1 rate, Section 232 rate, entered value and duty per unitEntry summary; CBP heading listEach entry batch
Metal weightSteel, aluminum, copper and total weightSupplier weight statement or drawingDesign or supplier change
Steel originMelt-and-pour country, by heat where possible; OTH lines flaggedSigned declaration; mill certificate on requestEach shipment
Aluminum originSmelt and cast countriesSigned declaration; cast-house certificate on requestEach shipment
U.S.-metal or USMCA claimU.S. metal share by weight; U.S. content valueLot records, cost breakdown, broker sign-offBefore each claim
Supplier surchargeBase metal and its index basis, conversion, freight and duty linesInvoice tied to entry numbers, or a certified duty per unitEach invoice
Scope watchProposed inclusions matching the ten-digit numberNotice, date and comment deadlineWeekly

This guide’s method, not a legal checklist; the broker or trade counsel decides classification, origin and valuation.

What origin evidence should you collect from suppliers?

Collect origin for every part in a derivative code, with or without metal. According to CBP’s Section 232 FAQs, ACE requires a melt-and-pour or smelt-and-cast country even for a derivative-coded product with no steel or aluminum, and filers can report OTH for derivative steel of unknown melt country. According to the same FAQs, a code in both derivative lists needs both countries.

Ask about scrap separately, because according to CBP’s answer on U.S. scrap, steel made from U.S. scrap that is remelted and poured outside the United States is not melted and poured in the United States. Record the melt country of each heat, not the scrap’s origin.

In this guide’s method, ask each supplier for a signed melt-and-pour or smelt-and-cast declaration per part and shipment, naming heat or lot where it can, with mill or cast-house certificates on sample or audit; for aluminum, the declaration also confirms that no primary aluminum in the part was smelted in Russia and none of it was cast there. Check that a certificate names where the steel was melted, not only the mill that rolled it. Where metal cannot be traced, budget the full rate, and ask the broker how to report an unknown aluminum smelt or cast country.

According to Commerce’s guidance effective October 14, 2026, U.S. content of qualifying USMCA goods in Annex I-C means the value of parts wholly obtained, entirely produced or substantially transformed in the United States and, if not already counted, of U.S.-melted steel and U.S.-smelted and cast aluminum or copper. For steel derivatives, according to CBP’s June 5, 2026 guidance, U.S. content above 40 percent of value goes on the 25% line. Ask suppliers for that split and their USMCA origin support; as importer of record you hold the evidence, and your broker decides the claim.

How do you unbundle a supplier’s Section 232 surcharge?

In a peer-reviewed 2021 study by Cavallo, Gopinath, Neiman and Tang, tariffs imposed from 2018 on goods including aluminum and steel passed through almost fully to U.S. import prices. According to the same study, its import-price comparison ran to February 2020, so read it as a short-run result for earlier tariffs, not a benchmark for a 2026 surcharge.

Ask suppliers that pass the duty on to bill it as its own line, apart from base metal and its index date, conversion, freight and other surcharges. Ask whether the index or premium behind the metal price is quoted duty-paid; if so, a separate duty line can charge the metal’s share of the duty twice, so ask the supplier to show what the line covers, and domestic-melt material with no entry should carry none. A percentage on a selling price that includes margin or freight can overstate the duty, so recompute from the entry.

Charge the duty line at actuals where you can: entry number, entered value, heading and rate, prorated to the units invoiced. Otherwise accept a certified duty-per-unit statement listing entry numbers, with an audit right; a pooled duty per kilogram for stocked material; or, for converters, duty per kilogram of imported input.

Reconcile those lines with entries each quarter. According to GAO’s July 2023 report on Section 232 exclusions, invalid exclusion use left an estimated $32 million in duties unpaid as of November 2021, and the lag before CBP manually deactivated exhausted exclusions let importers over-claim. Have the supplier credit you when a correction, refund or lower rate later applies to a paid entry.

Key the contract trigger, such as a new proclamation, CBP message or heading change, to the entry date, not the order or invoice date, because under CBP’s June 5, 2026 guidance, the June changes applied to goods entered for consumption, or withdrawn from warehouse for consumption, on or after June 8, 2026. Add the supplier’s evidence, each side’s share, the importer of record and Incoterm, and true-ups both ways until the broker confirms the entry is final. Clause design is in the Journal’s method for auditable contract escalation clauses; have legal review any term that shifts a duty.

What replaced Section 232 exclusions?

According to the Bureau of Industry and Security’s interim final rule of May 2, 2025, the Section 232 aluminum and steel exclusions process was no longer in effect as of February 10, 2025, and the rule removed its regulations. Under the same rule, an inclusions process took its place, with two-week windows each May, September and January for requests to add derivative articles.

According to GAO’s 2020 review of the exclusion process, Commerce received over 106,000 requests from March 2018 to November 2019, rejected over 19,000 for incorrect or incomplete information and approved two-thirds. Remove any price that still assumes an exclusion, and ask the supplier which heading it now files.

Under clause 11 of Proclamation 11021, the 2025 inclusion processes were terminated, and Commerce and the U.S. Trade Representative may add derivative articles whenever they jointly find that rising imports threaten national security or undermine the tariffs’ objectives, filled metal containers included. According to the same clause, a new derivative pays the clause 3 rates, 25% in general, or the clause 2 rates where comparable articles are in Annex I-A.

Treat the next scope change as a proposal until a final notice appears. In a Commerce notice of August 6, 2026, BIS asked for comments by August 27, 2026 on including 14 more derivative articles, including aluminum powder, fire extinguishers and trailers. According to that proposal, most would pay 25%, filled steel containers 50% on the container’s value alone and agricultural trailers the 15 percent tier.

Plan for short notice: according to CBP’s message CSMS 65936570, sent August 15, 2025, steel derivatives added under the 2025 inclusions process applied to goods entered from August 18, 2025. Check the Federal Register and CBP’s messages weekly against your register, and while a proposal is open, comment on the points listed in the August 2026 notice, routing comments through legal, government affairs or a trade association and keeping supplier names, prices and volumes out unless counsel agrees.

How do you compare landed cost for domestic and imported metal?

In this guide’s method, imported landed cost adds supplier price, freight and insurance, broker fees, customs user fees, origin-evidence cost and the duty stack: column 1 duty, Section 232 at the evidenced rate, any antidumping or countervailing duty and any other duty in force on the entry date. Ask trade counsel whether tooling or engineering you supply abroad, or buying through a trading company, changes the entered value. Compare it per part with a domestic quote at the same delivery point and an import made from U.S. metal, and rerun it for contract years after December 31, 2027.

According to Proclamation 11032, metal counts as entirely U.S.-melted or smelted when it is at least 85 percent of a product’s aluminum, steel and copper by weight, the test for the lower U.S.-metal rates, and Annex I-C goods move to the clause 3 rates of Proclamation 11021 on January 1, 2028.

Keep every duty in the stack because, according to CBP’s April 3, 2026 guidance, all antidumping, countervailing or other duties and charges applicable to such goods continue to be imposed. Case-level exposure is covered in the Journal’s guide to antidumping and countervailing duty exposure, and for copper and electrical steel, see where public supply evidence stops in the Journal’s research on copper and electrical-steel sources.

How will AI agents change Section 232 tariff management?

Frequently asked questions

Can a company still request a Section 232 exclusion for steel or aluminum?

Not under the current rules. According to the Bureau of Industry and Security’s interim final rule of May 2, 2025, the exclusions process was no longer in effect as of February 10, 2025. Watch instead for notices that add derivative articles.

Is the Section 232 duty charged on the full value of a derivative part?

Yes, for goods entered from April 6, 2026, except qualifying USMCA goods in Annex I-C: according to Proclamation 11021 of April 2, 2026, the duty applies to the full customs value, regardless of metal content. According to CBP’s guidance message CSMS 68253075, annex goods outside chapters 72, 73, 74 and 76 with under 15 percent of the applicable metals by weight are not subject to the duties. Confirm both tests with a licensed customs broker.

What if a supplier cannot say where the steel was melted?

According to CBP’s Section 232 FAQs, last modified November 17, 2026, filers can report OTH as the melt-and-pour country of derivative steel when the importer does not know it. Flag such lines and ask for mill records before any U.S.-metal rate is claimed.

Does a free trade agreement remove Section 232 duties?

Not by itself. According to CBP’s Section 232 FAQs, Section 232 duties may not be waived because of a free trade agreement unless a Chapter 99 classification provides a specific exemption for it. For qualifying USMCA goods in Annex I-C, according to Proclamation 11032, the 25% rate applies to non-U.S. content only, with at least 15 percent in total.

Sources

  1. Strengthening Actions Taken To Adjust Imports of Aluminum, Steel, and Copper Into the United States (Proclamation 11021 of April 2, 2026) — Executive Office of the President, Proclamation 11021; Federal Register 91 FR 18201-18266, document 2026-06960, April 9, 2026; read November 21, 2026, 2026. Current empirical evidence (official report): Duty applies to the full customs value regardless of metal content from April 6, 2026; Annex I-A 50%, Annex I-B 25%, UK 25%/15%, entirely U.S.-melted or smelted derivatives 10%; aluminum goods of Russian origin, Russian primary-aluminum smelt or Russian casting stay at 200% (clause 8); inclusion processes terminated and new derivatives added jointly by Commerce and USTR at clause 3 or clause 2 rates; domestic capacity utilization about 50.4% (aluminum) and 77.2% (steel), against about 39% and 72.3% in 2017.
  2. Steel and Aluminum Tariffs: Commerce Should Improve Its Exclusion Request Process and Ensure Its Reviews Are Documented (GAO-20-517) — U.S. Government Accountability Office, U.S. Government Accountability Office, GAO-20-517, September 15, 2020; product page with recommendation status read November 21, 2026, 2020. Historical evidence (official report): Over 106,000 exclusion requests from March 2018 to November 2019, over 19,000 rejected for incorrect or incomplete information, two-thirds approved, denials most often for technical errors or producer objections; Commerce no longer accepting or considering exclusion requests as of February 10, 2025.
  3. Steel and Aluminum Tariffs: Agencies Should Ensure Section 232 Exclusion Requests Are Needed and Duties Are Paid (GAO-23-105148) — U.S. Government Accountability Office, U.S. Government Accountability Office, GAO-23-105148, July 20, 2023; product page read November 21, 2026, 2023. Historical evidence (official report): An estimated $32 million in unpaid duties from invalid exclusion use as of November 2021; over-claiming tied to the lag before CBP's manual deactivation of exclusions.
  4. CSMS 65936570 - GUIDANCE: Section 232 Additional Steel Derivative Tariff Inclusion Products — U.S. Customs and Border Protection, U.S. Customs and Border Protection, CSMS 65936570, August 15, 2025; Cargo Systems Messaging Service bulletin; read November 21, 2026, 2025. Historical evidence (official report): CBP's message of August 15, 2025 announced steel derivative products added under the 2025 inclusions process for goods entered from August 18, 2025; under that message the duty on the steel derivative headings it listed (for example 9903.81.90 and 9903.81.91) was on the value of the steel content.
  5. CSMS 68253075 - GUIDANCE: Section 232 Duties on Imports of Aluminum, Steel, and Copper — U.S. Customs and Border Protection, U.S. Customs and Border Protection, CSMS 68253075, April 3, 2026; Cargo Systems Messaging Service bulletin; read November 21, 2026, 2026. Contextual evidence (official report): One rate for goods listed for more than one metal; annex goods outside chapters 72, 73, 74 and 76 with under 15 percent of the applicable metals by aggregate weight pay none and are reported under 9903.82.03 with the metal weight in kg as a second quantity; Russian aluminum lines at 200% may not use 9903.82.03; UK rates need at least 95 percent UK metal; only annex IV metals count toward the 15 percent; antidumping, countervailing and other duties continue to be imposed.
  6. Further Adjusting the Tariff Regimes for Imports of Aluminum, Steel, and Copper into the United States (Proclamation 11032 of June 1, 2026) — Executive Office of the President, Proclamation 11032; The White House, June 1, 2026, printed as 91 FR 34085, Federal Register document 2026-11314, June 4, 2026; read November 21, 2026, 2026. Contextual evidence (official report): Annex I-C articles 25% from June 8, 2026 to December 31, 2027 unless lower (combined 15% for listed partners, combined 10% for entirely U.S. metal, USMCA 25% on non-U.S. content with a 15% floor); agricultural equipment and some residential HVAC join the reduced 15% tier; metal deemed entirely U.S. at 85% by weight; Annex I-C to clause 3 rates from January 1, 2028.
  7. CSMS 68855869 - GUIDANCE: Further Adjusting the Tariff Regimes for Imports of Aluminum, Steel, and Copper Into the United States — U.S. Customs and Border Protection, CBP CSMS 68855869; U.S. Customs and Border Protection, Cargo Systems Messaging Service bulletin, June 5, 2026; read November 21, 2026, 2026. Contextual evidence (official report): Heading list and rates from June 8, 2026, applied to goods entered for consumption or withdrawn from warehouse on or after that date; the reduced tier brings column 1 plus Section 232 duty to 15% and adds nothing when column 1 is 15% or higher, for entries before January 1, 2028, after which its goods move to the 25%, UK 15% and U.S.-metal 10% headings; U.S. content above 40 percent of value goes on the 25% heading for USMCA steel derivatives; 0% for annex goods under the 15 percent metal-weight rule; the 'entirely' threshold moved from 95 to 85 percent.
  8. Section 232 Tariffs Frequently Asked Questions — U.S. Customs and Border Protection, U.S. Customs and Border Protection, Section 232 FAQs, last modified November 17, 2026; cbp.gov page read through the Internet Archive capture of November 17, 2026, 2026. Contextual evidence (official report): FTAs do not waive Section 232 duties unless a Chapter 99 classification exempts them; only HTS codes defined in the proclamations are reported for additional duty; ACE requires melt-and-pour or smelt-and-cast countries for derivative codes even without metal; OTH may be reported for unknown melt-and-pour country of derivative steel; both countries for codes in both lists; U.S. scrap remelted abroad is not U.S.-melted.
  9. Adoption and Procedures of the Section 232 Steel and Aluminum Tariff Inclusions Process — Bureau of Industry and Security, U.S. Department of Commerce, Bureau of Industry and Security, Federal Register, May 2, 2025; 90 FR 18780-18785, document 2025-07676, interim final rule effective April 30, 2025; read November 21, 2026, 2025. Historical evidence (official report): The exclusions process was no longer in effect as of February 10, 2025 and its regulations were removed; the 2025 inclusions process used two-week windows each May, September and January.
  10. Request for Public Comments on the Proposed Implementation of Duties on Additional Aluminum, Steel, and Copper Derivative Articles Under Section 232 — Bureau of Industry and Security, U.S. Department of Commerce, Bureau of Industry and Security, Federal Register, August 6, 2026; 91 FR 50756-50758, document 2026-15961, notice; read November 21, 2026, 2026. Contextual evidence (official report): Proposal (August 6, 2026; comments by August 27, 2026) to include 14 derivative articles, most at the 25% rate of Proclamation 11021, cranes and straddle carriers at Proclamation 11032 rates, agricultural trailers at the 15 percent tier and filled steel containers at 50% on the container's value only, not the contents' value; comment topics including metal intensity and domestic supply.
  11. Guidance to U.S. Customs and Border Protection Regarding the Assessment of “U.S. Content” for Purposes of Implementing Tariffs Pursuant to Clause (2)(D) of Proclamation 11032 of June 1, 2026 — Bureau of Industry and Security, U.S. Department of Commerce, Bureau of Industry and Security, Federal Register, October 14, 2026; 91 FR 65162, document 2026-20938, notice; read November 21, 2026, 2026. Contextual evidence (official report): U.S. content means the value attributable to parts wholly obtained, entirely produced or substantially transformed in the United States and, to the extent not otherwise counted, to steel melted and poured or aluminum and copper smelted and cast in the United States; effective October 14, 2026.
  12. Tariff Pass-Through at the Border and at the Store: Evidence from US Trade Policy — Alberto Cavallo; Gita Gopinath; Brent Neiman; Jenny Tang, American Economic Review: Insights 3(1): 19-34, March 2021 (American Economic Association), DOI 10.1257/aeri.20190536; published-version PDF hosted by Harvard Business School; read November 21, 2026, 2021. Historical evidence (peer reviewed journal): Tariffs imposed from 2018, on goods including aluminum and steel, passed through almost fully to US import prices, putting much of the incidence on the United States; import-price comparison to the end of February 2020; a short-run response.

Global Procurement Brief

Procurement news, briefed

The market moves, supplier signals, and cost levers that matter — curated by the team behind this Journal. Daily or weekly, your call.

We respect your privacy. No spam. Your data is never sold.

Related procurement resources

Request a demo
Request a demo