Facilities management procurement

Compare facilities management services on one site scope, so a price per square foot means the same thing

Commercial cleaning services quote per gross or per cleanable square foot, at a service level and a night count they chose, and an integrated facilities management bid folds its fee and its subcontractors into the same number. Zinit's AI agents build one site scope from your floor plans, frequencies and asset register, send it to integrated firms and specialists alike and read every bid back against it, so your team awards on the same hours, the same wage rules and the same fee base.

  • 103M+ supplier and company database
  • First RFP in under an hour
  • Your team directs and approves
  • SOC 2

The site scope, before anyone prices it

Four buildings of one company, for a contract starting in 2027. Every number in the example on this page belongs to that company.

SiteGross sq ftCleanable sq ftService levelCleaning hours a yearJanitor's pay, 2027Security post hoursAssets in register
San Jose, CaliforniaR&D campus268,000204,000APPA Level 225,408$24.2517,520132
New York, New YorkOffice building148,000112,000APPA Level 213,950$33.208,32058
Columbus, OhioOperations and light assembly410,000236,000APPA Level 318,524$18.0017,520196
Charlotte, North CarolinaOperations center174,000132,000APPA Level 310,361$17.254,16064
Portfolio1,000,000684,00068,24347,520450

Cleaning, price per square foot a year

As quoted

  1. Bid AIntegrated incumbent$2.86per gross sq ft
  2. Bid BIntegrated challenger$1.84per gross sq ft
  3. Bid CSpecialists by tower$3.80per cleanable sq ft

On this scope

  1. Bid AIntegrated incumbent$4.18per cleanable sq ft
  2. Bid BIntegrated challenger$3.92per cleanable sq ft
  3. Bid CSpecialists by tower$3.80per cleanable sq ft
As quoted, Bid B looks $1.02 a square foot under Bid A and Bid C looks the dearest of the three. On this scope Bid C is the lowest, $0.12 under Bid B, because Bid B priced 52,746 of the 68,243 cleaning hours the scope calls for.

Cleaners' pay has risen faster than the price of cleaning, so a low bid has to find its hours somewhere

Since January 2020 average hourly earnings in janitorial services have risen 38.3%, to $19.73, while the producer price index for janitorial services has risen 29.1% and the index for security guards 39.8%. The series are not like for like, since earnings move with who is employed and where and an index follows a fixed set of services. Our reading is still that a cleaning bid well under the field has less room than it used to, and the first place to look is the hours it priced.

Earnings against price, January 2020 = 100
1001201402020212223242526latest139.8138.3129.1
  • Average hourly earnings, janitorial services
  • Producer price index, security guards
  • Producer price index, janitorial services

Latest points are preliminary: earnings for August 2026, the indexes for September 2026.

Janitorial services jobs went from 1.10 million in January 2020 to 1.08 million in August 2026 (preliminary).

How much revenue passes straight through, fiscal 2025

  1. JLLReal Estate Management Services: gross contract costs85.5%
  2. CBREBuilding Operations & Experience: pass-through costs53.9%
  3. Cushman & WakefieldWhole company: gross contract reimbursables31.4%

Each firm draws the line its own way: JLL counts client-dedicated people as well as vendors and subcontractors, CBRE counts subcontracted third-party vendors, and Cushman & Wakefield says its reimbursables carry substantially no margin. CBRE adds that it typically self-performs technical services and often subcontracts janitorial, security and landscaping. ABM, which mostly does the work itself, reports direct labor at 68% of revenue and a gross margin of 12.3%.

A square foot holds an area, a service level and a wage before anyone prices it

Gross area counts walls, shafts and plant rooms nobody cleans, so public janitorial bids tend to work from something narrower: Pekin, Illinois' school district bids from a Net Cleanable Square Feet and Fixture Summary, with cleaning frequencies in exhibits of their own. The service level then sets the hours, and drawn out it moves them further than the phrase suggests.

Cleaning hours a year for 100,000 cleanable sq ft, five nights a week
  1. Level 1, Orderly Spotlessness8,500 sq ft per custodian24,471
  2. Level 2, Ordinary Tidiness16,700 sq ft per custodian12,455
  3. Level 3, Casual Inattention26,500 sq ft per custodian7,849
  4. Level 4, Moderate Dinginess39,500 sq ft per custodian5,266
  5. Level 5, Unkempt Neglect45,600 sq ft per custodian4,561

APPA's staffing levels as Boise State University publishes them, in square feet per custodian, for a classroom with a hard floor, worked out over an eight-hour shift and 260 nights. Offices and restrooms run differently. The example borrows this row to show the spread, and a real event uses each bidder's own workloading.

What each address does to a cleaning or security bid

A janitor's pay in a Manhattan office building comes off a bargaining table and in Columbus it comes off the local labor market, so a rate blended across a portfolio hides the line that matters. Worker retention and written contract rules also decide what a new supplier takes on from its first night.

Site in the examplePay it usesWhat sits behind that payWhat the address adds
San Jose, California$24.25The Northern California agreement's master rate from May 2027. The metro median for all employers was $21.09 in May 2025.A successor keeps the terminated contractor's workers for a 60-day transition, and a janitorial employer registers with the Labor Commissioner.
New York, New York$33.2032BJ and the Realty Advisory Board: $29.47 at the end of 2023 plus $3.725 an hour by the end of the four-year contract. The metro median for all employers was $20.60 in May 2025.A successor keeps building service workers for a 90-day transition. The owners' group put the cost of a commercial building worker at more than $106,000 a year in 2023.
Columbus, Ohio$18.00A market rate near the metro median for all employers, $17.94 in May 2025.The example treats it as open shop, and your counsel confirms that for the real address.
Charlotte, North Carolina$17.25A market rate near the metro median for all employers, $17.12 in May 2025.The example treats it as open shop, and your counsel confirms that for the real address.

Outside the example: Washington, DC gives covered workers a 90-day transition under a new contractor, and a federal service contract over $2,500 carries locally prevailing wages and fringe benefits, or the rates in a predecessor's collective bargaining agreement.

California's question for the buyer

Labor Code 2810 says a person or entity shall not enter into a janitorial or security guard contract if it knows or should know that the contract does not include funds sufficient for the contractor to comply with the law. A written contract in one document, stating among other things the total number of workers and the total wages, earns a rebuttable presumption of no violation, and the section does not apply to whoever executes a collective bargaining agreement covering those workers. Section 1432 adds a civil fine of $2,000 to $10,000 for a first contract with an unregistered janitorial employer.

San Jose, one year of cleaning
  • Wages and burden for the scope's 25,408 hours, before anyone's margin$893,409
  • Bid A's San Jose price$1,099,965
  • Bid B's San Jose price$530,192
  • Bid C's San Jose price$1,000,618

Bid B's price is $363,217 short of wages and burden on the scope, which is the kind of gap a buyer holding the scope can see. Whether it is a legal problem is for your counsel.

Integrated, bundled or single-service: what a fair comparison has to hold still

Each model puts the money in a different place, so comparing them on a contract total alone rewards whichever one left the most outside the total. The first thing that falls out is usually your own cost of running the contracts.

What you buyWho usually does the workWhere the money sitsWhat to hold constant
Single-serviceOne trade, usually by site or region: commercial cleaning, security, HVAC maintenance contracts, elevators.The supplier's own crews.Labor and margin inside a square-foot, hourly or monthly price.The scope by site, and the people you keep to manage several contracts.
BundledSeveral services from one supplier, often the soft services together.Its own crews for its core trades, subcontractors for the rest.Margin on each service, and a markup on whatever it subcontracts.The self-perform share by service, and what sits outside the bundle.
Integrated FMHard and soft services under one contract and one account team, usually across the portfolio.A mix. CBRE says it typically self-performs technical services and often subcontracts soft services.A management fee, a markup on subcontracts, and reimbursed client-dedicated staff.The base the fee is charged on, the markup, the staff you reimburse and who holds each subcontract.

Who carries what, under each way of pricing it

Our reading of how each form usually works, with the public documents that show it. Your contract decides, and two lines of a bid can sit under different forms.

Fixed price to a specificationCost-plus with a fixed feeGuaranteed maximum priceOutput-based
Hours and staffingSupplierYouSupplier, above the capSupplier
Wage increasesSupplier, until the escalatorYouSupplier, up to the capSupplier, until the escalator
Reactive workYou, unless includedYouSupplier, up to the capNegotiated
Asset conditionYou, through exclusionsYouShared, through exclusionsPriced as risk by the supplier
QualityYou, by inspectionYou, by inspectionYou, by inspectionSupplier, against measured standards

The documents: Pekin's flat-fee bid caps annual increases at CPI and no more than 3%, Grand Rapids airport's RFP is a cost-plus contract with a fixed fee, CBRE describes guaranteed maximum contracts as a not-to-exceed price, and federal rules ask for required results rather than how the work is done or the number of hours. An output-based contract drops the frequencies, which is why a thin asset register comes back as a risk premium.

Where the fee sits decides what a percentage is worth

A management fee means little until you know its base. Grand Rapids airport's janitorial RFP reimburses approved costs with no markup and pays a fixed monthly fee. Capitol Region Education Council in Connecticut bars vendors from marking up wages and says vendor profit is earned in a management fee per square foot.

What $100,000 of subcontract work costs you
  1. Bid A: 10% markup, then a 5% fee on it$115,500
  2. Bid B: 15% markup, its 3% fee skips pass-through$115,000
  3. Bid C: 6% markup, no fee$106,000
  4. At cost, with the fee fixed separately$100,000

Bid A's 5% fee and Bid B's 3% fee land within $500 of each other on this line, since Bid B collects through its markup.

Who can stop a supplier, and what each of them needs to see

The category manager runs the comparison, and four other desks can end it. Bring them in before the scope goes out, because each one's objection turns into a column of the matrix.

DeskCan stop it onNeeds to see in the bid
Category manager or sourcing leadRuns itA comparison that does not hold.One tab on one scope, with each bidder's hours, fee base and exclusions on the same lines.
Head of facilities or real estateSigns the budgetLosing control of the portfolio, or adding contracts with no one to run them.Total cost including the people you keep, and who answers when a site calls at 2 a.m.
Site leadersCan vetoDisruption: a missed clean in a lab, a lobby post gone on the first Monday.Their own row of the matrix, the night count and service level, the transition plan and the names on the crew.
Environment, health and safetyCan vetoContractor safety. OSHA's multi-employer policy can reach an employer with general supervisory authority over a worksite, which contract or practice can establish, with a duty of reasonable care that grows if a contractor has a history of non-compliance.Each bidder's safety history by trade and who inspects whom, subcontractors included.
FinanceCan vetoCapital sliding into operating lines, or the reverse.Where a repair stops and a replacement starts, the dollar limit for each, whether the fee applies to capital work, and the escalator.
Legal and labor relationsCan vetoWage, union and successor obligations a bid has priced wrongly.The wage rule at each address, the labor line behind each price, registration and licence numbers, and the transition terms.

How Zinit runs a facilities event

A 103M+ supplier and company database, AI agents that build the scope and run the bidding, and procurement people who work beside your team.

Your buildings, on one scope

Zinit reads your contracts, floor plans, asset register and the last 12 months of invoices and work orders, and it builds the matrix every bidder prices: cleanable area, nights and service level, posts, assets, and the wage rule at each address. Whoever knows each site corrects its row before anyone sees it, and your team chases the ones nobody answers.

One scope that every bid prices

Integrated firms and the regional ones

Your incumbent and the suppliers your team approves, drawn from a 103M+ supplier and company database and narrowed to a short list your team signs off, from national integrated firms to specialists near each site. Nobody is contacted until the list is approved, and your own insurance, licensing and safety requirements go out with the invitation.

A reviewed field before the award

A year, leveled

The first RFP is drafted in under an hour, and your team then settles the scope and the terms, which is the slow part on a portfolio with stale records; the bids take the time they take. Each bid is read back against the matrix with its hours, fee base, markup, self-perform share and exclusions on the same lines. Every figure in the table points back to the place in the bid it came from, so your team checks it before finance sees it.

A number your finance team can sign

Sometimes the incumbent's renewal is the best bid, and then your team renews with the market's prices in hand. Zinit is not a cleaning contractor, an integrated FM firm or a real estate broker: it supplies no crews, manages no buildings and holds no real estate licence. The event ends at the award, so your team keeps auditing invoices and inspecting the work.

The night crew works from the scope it was given, so anything the scope leaves out stays undone until somebody complains.

The event, on one portfolio

Six steps, then the tab. A larger portfolio has more rows and the same columns.

  1. Read

    Contracts, floor plans, the asset register and 12 months of invoices and work orders. The reactive line in the example, $1,400,000 at cost, comes straight from that history.

  2. Scope

    One row per site, 1,000,000 gross and 684,000 cleanable square feet in all, 68,243 cleaning hours, 47,520 post hours and 450 assets. Someone who knows each site marks up its row, and where a plan is old or missing the row says so and a site walk settles it before pricing.

  3. Schedule

    Every bidder fills in the same lines: hours, pay, burden and margin by site, the fee and its base, the markup on subcontracts, what it self-performs, the dollar line between a repair and a capital job, its safety record by trade, and every exclusion in writing.

  4. Invite

    The incumbent first, then integrated firms and specialists on a list your team signs off, with state registration and licence numbers asked for up front.

  5. Level

    Each bid is read back against the scope. A bidder whose hours, area or allowance differ from it can reprice, or say why the scope is wrong, which sometimes it is.

  6. Award

    By tower and site if that is what the tab says, with your team deciding, and the transition and worker retention terms written in before signature.

The bid tab, per year

Bid C holds cleaning and security with a soft-services firm and planned maintenance with a technical-services firm. Fee and markup rows print each bid's own terms.

LineBid AIntegrated incumbentBid BIntegrated challengerBid CSpecialists by tower
As quoted$7,797,141$5,412,176$6,881,860
Per gross sq ft, as quoted$7.80$5.41$6.88
What the quote left out, against the scope
Cleaning hours priced, of 68,24368,24352,74668,243
Assets priced, of 450450396450
Reactive work allowed for, of $1,400,000$1,400,000$700,000$1,400,000
On one scope
Cleaning, 68,243 hours at each site's pay and burden$2,857,549$2,681,621$2,599,460
Supplier margin, then integrator's markup14%, then 8%9%, then 6%12%, none
Security, 47,520 post hours$1,745,800$1,624,000$1,583,400
Bill rate as a multiple of pay1.72 times1.60 times1.56 times
Planned maintenance, 450 assets$1,282,500$1,143,000$1,215,000
Price per asset a year$2,850$2,540$2,700
Reactive work, $1,400,000 at cost$1,540,000$1,610,000$1,484,000
Markup on subcontract work10%15%6%
Management fee$371,292$163,459$0
Rate and base5% on all lines3% on all but reactivenone
People you keep to run it, at $150,000 each$150,000$150,000$375,000
Full-time equivalents1.01.02.5
Transition, one time, over three years$0$50,000$70,000
Total, per year$7,947,141$7,422,080$7,326,860
Per gross sq ft, on the scope$7.95$7.42$7.33
Share the bidder does itself17%16%78%
Against renewing with Bid A–−$525k−$620k

Bid AIntegrated incumbent

As quoted
$7,797,141
Cleaning hours priced, of 68,243
68,243
Assets priced, of 450
450
Reactive work allowed for, of $1,400,000
$1,400,000
Cleaning, 68,243 hours at each site's pay and burden14%, then 8%
$2,857,549
Security, 47,520 post hours1.72 times pay
$1,745,800
Planned maintenance, 450 assets$2,850 an asset
$1,282,500
Reactive work, $1,400,000 at cost10% markup
$1,540,000
Management fee5% on all lines
$371,292
People you keep to run it, at $150,000 each1.0 full-time
$150,000
Transition, one time, over three years
$0
Total, per year
$7,947,141
Per gross sq ft, on the scope
$7.95
Share the bidder does itself
17%
Against renewing with Bid A
–

Bid BIntegrated challenger

As quoted
$5,412,176
Cleaning hours priced, of 68,243
52,746
Assets priced, of 450
396
Reactive work allowed for, of $1,400,000
$700,000
Cleaning, 68,243 hours at each site's pay and burden9%, then 6%
$2,681,621
Security, 47,520 post hours1.60 times pay
$1,624,000
Planned maintenance, 450 assets$2,540 an asset
$1,143,000
Reactive work, $1,400,000 at cost15% markup
$1,610,000
Management fee3% on all but reactive
$163,459
People you keep to run it, at $150,000 each1.0 full-time
$150,000
Transition, one time, over three years
$50,000
Total, per year
$7,422,080
Per gross sq ft, on the scope
$7.42
Share the bidder does itself
16%
Against renewing with Bid A
−$525k

Bid CSpecialists by tower

As quoted
$6,881,860
Cleaning hours priced, of 68,243
68,243
Assets priced, of 450
450
Reactive work allowed for, of $1,400,000
$1,400,000
Cleaning, 68,243 hours at each site's pay and burden12%, none
$2,599,460
Security, 47,520 post hours1.56 times pay
$1,583,400
Planned maintenance, 450 assets$2,700 an asset
$1,215,000
Reactive work, $1,400,000 at cost6% markup
$1,484,000
Management feenone
$0
People you keep to run it, at $150,000 each2.5 full-time
$375,000
Transition, one time, over three years
$70,000
Total, per year
$7,326,860
Per gross sq ft, on the scope
$7.33
Share the bidder does itself
78%
Against renewing with Bid A
−$620k

Cleaning hours are cleanable area times 260 nights times 8 hours, divided by square feet per custodian: 16,700 at Level 2 and 26,500 at Level 3. Each site's labor is hours times pay times burden and benefits: 45% in San Jose, 70% in New York, 25% in Columbus and Charlotte. Bid B priced Level 3 everywhere and San Jose at 192,000 cleanable square feet on the $21.00 rate. Security pay is $24.00, $23.50, $18.50 and $18.00 an hour by site, near May 2025 metro medians for guards. Paper, liners and soap are outside the scope.

Bid C ends lowest, $95k under Bid B and $620k under renewal. A $95k gap is small on a contract this size, so your team would weigh it against having one party answer for everything, and the tab has already charged Bid C for the extra management time.

If reactive work runs 20% over, Bid A adds $323,400, Bid B $322,000 and Bid C $296,800, since the markup and any fee ride on every extra dollar.

VERIFIED BENCHMARKS

Proven savings across Real Estate & Facilities Management Procurement

Category / LeverSavings Range
Integrated FM services12-20%
Individual hard FM services (HVAC, electrical, plumbing)15-25%
Soft FM (cleaning, security, catering)12-22%
Construction and fit-out8-15%
Grounds and landscape maintenance12-20%
Contract escalation cap savings (competitive re-baseline)5-15%

Where this page stops

This page is about the services that keep buildings you already hold running, across hard FM, soft FM and integrated contracts. A few neighbours get their own treatment, so a contract that crosses a line is split at that line.

  • Integrated facilities managementBundled multi-service contracts across a portfolio.
  • Hard FMHVAC maintenance contracts, electrical, plumbing, elevators, fire and life safety, building automation.
  • Soft FMCommercial cleaning services, security, reception, mailroom, catering.
  • GroundsLandscaping, snow, parking lots and exterior upkeep.

Next door

Paper, liners, soap and other workplace consumables go to office supplies and facilities, and the scope states who buys them so no bid prices them twice.

Renovation, tenant improvements and fit-out go to the construction page, because a project is priced on its drawings and its schedule, and your FM provider can still bid it there.

Workplace strategy and portfolio studies are consulting, and sit with professional services.

Lease negotiation, site search and listings are real estate brokerage, which stays with your licensed broker and counsel. The questions below say why.

The market, by what you are buying

A portfolio usually buys from several of these, sometimes through one integrated contract. Regional firms near each site are invited from the database, so they do not appear here by name.

Integrated facilities management

hard and soft services under one contract

  • CBRE
  • JLL
  • Cushman & Wakefield
  • Sodexo
  • ISS

Commercial cleaning and soft services

janitorial crews and day services at scale

  • ABM
  • KBS
  • Aramark

Contract security

guards and patrol, usually billed by the post hour

  • Allied Universal
  • Securitas
  • GardaWorld
  • Prosegur

HVAC and building technical services

maintenance contracts, controls and mechanical

  • Johnson Controls
  • Trane
  • Carrier
  • EMCOR
  • Comfort Systems USA

Elevators and escalators

maintenance from the original manufacturers

  • Otis
  • Schindler
  • KONE
  • TK Elevator

Grounds and pest

landscaping, snow and pest control

  • BrightView
  • Rentokil Initial

Established suppliers in each category, shown to illustrate the market, not as a list of Zinit's customers or partners.

One result across many RFPs, and the companies RFPs were published from.

A mining customer's result across its recent RFPs and the logo row from the homepage, both as the rest of the site shows them.

Mining

Saved over 12% across 28 recent RFPs

A mining customer's recent RFPs, across its categories. The customer is not named.

RFPs published from

  • Magna
  • Avery Dennison
  • Carlsberg Group
  • Ucell
  • JD
  • Cargill

As shown on the homepage.

The questions a facilities team asks first

What does it cost?

Zinit is supplier-funded and free to buyers: only the supplier your team selects as the winner pays a commission, the losing bidders pay nothing, and nothing is owed until you award. The commission rates are published openly on our site, and because the fee is tied to the award your team makes rather than to who competes, Zinit earns the same whichever qualified supplier you choose.

A supplier-funded fee can end up in the price. Why would yours be any different?

It can, the same way any cost of winning can, which is why the tab compares every bid all-in, so whatever a bidder has built in shows in its number. It is also small: under the fee schedule in Zinit's terms of service an award the size of the example's $6.88M a year carries a $4,000 flat fee plus 0.04% of the RFP volume, about $6,800 once, which is about 0.7 of a cent per gross square foot. Written as a three-year RFP of $20.65M, it is $5,000 plus 0.03%, about $11,200 once. If your CFO would rather keep it out of the bids altogether, the same terms let the buyer elect to carry the fee when the RFP is published.

Can Zinit run a lease, a site search or a tenant representation event?

No. Those are real estate brokerage, which the states license in words wide enough to catch a paid party that solicits prospective tenants (California), takes any part in procuring lessors or lessees (Florida), or negotiates a rental or lease for another for a fee (New York, Texas). A tenant representation fee is commonly paid by the landlord out of the leasing commission, so a party paid on that event would be sitting in the regulated seat, and Zinit holds no real estate licence. Your licensed broker and counsel keep those events. Buying cleaning, security and maintenance for buildings you already hold involves no lease or rent, which is why this page stays on that side of the line, and your counsel is the one to confirm it.

What about choosing the broker or the property manager itself?

That is a services purchase, and it still goes to your counsel first, because those firms are licensees. California makes it unlawful for a licensed broker to compensate an unlicensed person for acts within the scope of the licence, New York bars a broker from sharing a commission for help in a lease, and Texas and Illinois say much the same. A property manager that collects rents is often a broker under the same statutes.

Is Zinit a cleaning company or a property manager?

No. Zinit runs the sourcing event for companies that buy these services across many buildings. If you need a cleaner for one office, a local provider will serve you faster than an event would.

Our buildings are union. Does competitive bidding still work?

Yes, and the wage line simply stops being what they compete on. Bidders price the agreement's rates, and the tab shows them competing on hours, supervision, supplies and margin. Your labor relations lead tells us the agreement at each address before the schedule goes out, and in California the contract rule above has its own carve-out for whoever signs a collective bargaining agreement covering those workers, which your counsel can read against your facts.

What happens to the cleaners and guards on site if the contractor changes?

Nothing moves because an event runs. Where a retention law applies, a new contractor keeps covered workers for a transition period, 60 days under California's Displaced Janitor Opportunity Act and 90 days in New York City and Washington, DC. Each bid states its transition terms by site, and your site leaders and counsel decide before award.

Our asset register is out of date. Can we still run this?

Yes, and it is the usual case, though expect your team to spend time on it. Zinit's agents flag duplicate tags, retired assets and rows with no data, and anything they cannot read, a scanned plan or a work order that just says fixed leak, stays marked for a person. Where the plan says one area and the invoices imply another, the row shows both until your team picks. Whatever is still unknown goes out marked as unverified. Bidders then price per asset by class, and the contract adjusts by those unit prices after a verification period. Texas A&M's facilities agreement gives its vendor three months from the effective date to complete a custodial assessment and work plan, which is the same idea on the cleaning side. A thin register still costs something, because a bidder who cannot see an asset's condition prices the doubt.

We are mid-term on an integrated contract.

Then the event is your benchmark for one tower in one region, or your preparation for the renewal, whichever your termination terms allow. The incumbent is invited first and prices the same scope. If it wins, your team renews at the market's prices, and it pays the same published fee as any other winner unless you elected to carry it.

Our integrator will tell our VP the scope is wrong.

Sometimes it will be right, and that is useful. The incumbent knows the buildings better than anyone, so it marks up the same scope like every other bidder and says what it would change and why. Your team decides, and any correction goes to all the bidders, so the comparison stays on one scope and the argument happens before the prices come in. If it will only quote its own format, your team can still accept that bid, and it gets read against the scope with the gaps marked, which is what your VP sees.

Do you have a facilities reference we can call?

Not yet, and we would rather say so. The results we can show come from other categories, so the fair way to test this is one service at one site or in one region, on your own scope and your own messy data, before anything bigger.

Start with the facilities contract that renews next

Bring the floor plans, the current contract and 12 months of invoices and work orders, for one service at one site if that is the fair first test. Zinit builds the site scope, runs the event and levels the bids, with your team directing and approving every step.

Sources

  1. [1] California Business and Professions Code, sections 10131 and 10137 (Internet Archive captures of the Legislative Information site)a real estate broker includes a person who, for compensation, leases or solicits for prospective tenants or collects rents; a licensed broker may not compensate an unlicensed person for those acts
  2. [2] New York Real Property Law, sections 440 and 442 (Internet Archive captures of the Senate site)a broker includes one who, for a fee, negotiates a rental or collects rent; a broker may not share a commission for help in a lease with an unlicensed person
  3. [3] Florida Statutes, sections 475.01 and 475.42a broker includes one who takes any part in the procuring of lessors or lessees; operating without a licence is a third-degree felony
  4. [4] Texas Occupations Code, sections 1101.002 and 1101.651 (read at Texas.Public.Law)a broker includes one who negotiates a lease for another for a commission; a licensed broker may not compensate an unlicensed person for an act of a broker
  5. [5] Illinois Compiled Statutes, 225 ILCS 454/10-15no compensation may be paid to an unlicensed person for performing licensed activities
  6. [6] Wikipedia, Leasing commission (read November 5, 2026; a tagged, general description)the leasing commission is paid by the landlord to the listing broker, who splits a portion with the tenant representative
  7. [7] California Labor Code, section 2810 (Internet Archive capture of the Legislative Information site)funds sufficient in a janitorial or security guard contract, the written contract with total workers and total wages, the rebuttable presumption, the collective bargaining exception
  8. [8] California Labor Code, sections 1061, 1420 and 1432 (read at California.Public.Law), and the Labor Commissioner on janitorial registrationa successor keeps employees for a 60-day transition; janitorial employers register; a civil fine of $2,000 to $10,000 for a first contract with an unregistered employer
  9. [9] New York City Administrative Code, section 22-505 (public mirror of the code)a successor employer retains building service employees for a 90-day transition
  10. [10] Code of the District of Columbia, section 32-102a new contractor retains covered employees for a 90-day transition
  11. [11] US Department of Labor, Wage and Hour Division, Fact Sheet 67, Service Contract Actfederal service contracts over $2,500 pay locally prevailing wages and fringe benefits, or a predecessor's collective bargaining rates
  12. [12] SEIU United Service Workers West, Northern California Maintenance Contractors Agreement, May 1, 2024 to April 30, 2028 (read by OCR)a master contract site is 200,000 total cleanable square feet or greater; Santa Clara County minimum master wage $23.25 from May 2026 and $24.25 from May 2027, against $20.50 and $21.00 on a 150,000 to 200,000 sq ft site
  13. [13] Facilities Dive, New York City building workers approve new contract (February 2024)$29.47 an hour as of December 31, 2023 and a raise of $3.725 an hour by the end of the four-year contract, for 32BJ members under the Realty Advisory Board agreement
  14. [14] Facilities Dive, NYC building service workers strike threat (2023)the owners' fact sheet: more than $106,000 a year in wages and benefits to employ a commercial building worker
  15. [15] US Bureau of Labor Statistics, Producer Price Index, janitorial services (January 2020 to September 2026, preliminary)PCU561720561720: 145.8 to 188.158
  16. [16] US Bureau of Labor Statistics, Producer Price Index, security guards and patrol services (January 2020 to September 2026, preliminary)PCU561612561612: 128.7 to 179.932
  17. [17] US Bureau of Labor Statistics, Current Employment Statistics, janitorial services (January 2020 to August 2026, preliminary)CES6056172008 average hourly earnings $14.27 to $19.73; CES6056172001 employment 1,100.8 to 1,080.2 thousand
  18. [18] US Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025, read through the public APIhourly medians for janitors (37-2011) and security guards (33-9032): San Jose $21.09 and $22.23, New York $20.60 and $21.15, Columbus $17.94 and $17.21, Charlotte $17.12 and $16.83
  19. [19] JLL, Form 10-K for 2025Real Estate Management Services: revenue $20,001.2 million, gross contract costs $17,102.0 million; what gross contract costs include; Workplace Management pricing models
  20. [20] CBRE Group, Form 10-K for 2025Building Operations & Experience: revenue $23,224 million, pass-through costs $12,529 million; technical services typically self-performed and soft services often subcontracted; fixed fee and guaranteed maximum contracts
  21. [21] Cushman & Wakefield, Form 10-K for 2025total revenue $10,288.2 million, gross contract reimbursables $3,226.9 million with substantially no margin
  22. [22] ABM Industries, Form 10-K for fiscal 2025direct labor 68% of revenue, gross margin 12.3%, contract types including square-foot, cost-plus and hourly
  23. [23] Pekin Public Schools District 108, custodial bid document (February 2024)Net Cleanable Square Feet and Fixture Summary, frequency exhibits, flat-fee contract, annual increases at CPI with a 3% ceiling
  24. [24] Gerald R. Ford International Airport Authority, RFP 2403, Janitorial Services (February 29, 2024)a cost-plus contract with a fixed management fee, reimbursable expenses with no markup, about 450,000 square feet
  25. [25] Capitol Region Education Council, Contracted Facilities Management Services RFP (2020)vendors cannot mark up wages; vendor profit is earned in the management fee; a management fee per square foot; invoices by address
  26. [26] The Texas A&M University System, Facilities and Other Services Agreement with SSC (effective August 1, 2024; read by OCR, fee figures redacted)adopted APPA levels; a custodial assessment and work plan within three months
  27. [27] Boise State University, APPA custodial standardssquare feet per custodian at each of the five APPA levels for a classroom with a hard floor: 8,500, 16,700, 26,500, 39,500 and 45,600
  28. [28] Federal Acquisition Regulation, 37.601 and 37.602performance-based contracts carry measurable performance standards and describe required results rather than how the work is done or the number of hours
  29. [29] Occupational Safety and Health Administration, CPL 2-0.124, Multi-Employer Citation Policy (Internet Archive capture)a controlling employer has general supervisory authority, established by contract or in practice, with a duty of reasonable care that grows with a contractor's history of non-compliance
  30. [30] Zinit, Terms of Service, Schedule 1, Service Fee Schedule (effective July 28, 2026)the published supplier fee: flat fee plus a share of the RFP volume, and the buyer's election to carry it
Request a demo
Request a demo