Zinit Categories MRO & Industrial

MRO suppliers and industrial distributors, bid on your own parts list.

Most MRO contracts price a few hundred part numbers line by line and leave thousands more to a discount off the distributor's own list. Zinit's AI agents build the bid from your own parts list, turn every discount into dollars on parts you actually buy, and ask each distributor where your critical spares will sit, while your team directs and approves.

  • 103M+ supplier and company database
  • First RFP in under an hour
  • Your team directs and approves
  • SOC 2
One parts list, ranked two waysExampleExample operator · last 12 months · 11,200 part numbers · $18.4M
  1. Basket: top 400, 52% of spend
  2. Nitrile gloves#1 · $214,000
  3. Stretch film#2 · $188,000
  4. LED high-bay lamps#41 · $46,000
  5. Tail: 10,800 more part numbers
  6. Baler hose#2,960 · $1,860
  7. Palletizer drive#3,480 · $1,480
  8. CIP pump seal#4,710 · $900
  9. Elevator bearing#6,140 · $612
  1. Critical list: 46 part numbers
  2. Elevator bearingcritical #1
  3. CIP pump sealcritical #2
  4. Palletizer drivecritical #4
  5. Baler hosecritical #11
  6. Not on the critical list
  7. Nitrile gloves—
  8. Stretch film—
  9. LED high-bay lamps—
#6,140 by spend, #1 by consequenceThe bearing under plant 2's bucket elevator was bought once last year, for $612, so no basket ever priced it, and when it failed in March every packing line in the plant waited 31 hours for the next one.

Producer prices for MRO goods since January 2020

US Bureau of Labor Statistics producer price indexes, January 2020 to September 2026 (September preliminary)

  1. Fluid power valves and hose fittingsPCU332912332912+90.9%
  2. Mechanical power transmissionPCU333613333613+62.5%
  3. Bolts, nuts, screws and washersPCU332722332722+56.7%
  4. Industrial valvesPCU332911332911+49.7%
  5. Motors and generatorsPCU335312335312+46.3%
  6. Ball and roller bearingsPCU332991332991+44.2%
  7. Hand and edge toolsPCU332216332216+39.3%
  8. Hose and beltingPCU326220326220+22.7%
  9. Distributors' gross marginsPPI for machinery, equipment and supplies merchant wholesalers, which tracks the margin a wholesaler earns rather than the price of the goods+54.0%
Fastenal reported that product pricing added about 240 basis points to its net sales in the third quarter of 2026, after 310 to 340 in the fourth quarter of 2025, which is the list moving under a discount that stays fixed.

What one missing spare cost the example last March

$573,580 for a bearing bought once a year at $612

  • Production lost at plant 231 hours × $18,400 an hour (1,150 cases × $16.00 contribution)$570,400
  • Freight and the emergency price$2,560 next-flight freight + $620 over the contract price$3,180
  • One stopProduction lost + freight and emergency price$573,580

Siemens' 2024 survey of large plants, research by a predictive-maintenance vendor, puts an hour of unplanned downtime at $36,000 in consumer goods and $2.3 million in automotive. The example uses its own plant's contribution per hour, which is lower.

Three ways an MRO distributor contract is priced, and what each one leaves unpriced

Most MRO spend reaches a plant through one of three contract forms, and each one prices a different part of the list. The quotes below come from public solicitations and company filings, as published, and a private contract often mixes all three.

  1. Market basket plus a discount off list

    What is pricedA few hundred part numbers at a net price, and a percentage off the distributor's list for everything else in its catalog.

    On the recordNASPO ValuePoint's 2017 MRO solicitation gave the market basket 35 of its 40 price points and the discount off list 5, held the discount for the life of the agreement and let buyers order anything else from the catalog.

    What it leaves unpricedThe list itself, which belongs to the distributor and moves. On one distributor's public-contract hot list of 811 items the discount off its own reference price runs from 5% to 89%.

  2. Cost plus a markup or a margin

    What is pricedThe distributor's cost for each part, plus an agreed markup, a margin or a management fee.

    On the recordSourcewell's on-site inventory contract with NAPA Integrated Business Solutions offers parts at a 10% gross margin or an 11% markup over acquisition cost, or at cost with a separate management fee.

    What it leaves unpricedThe cost base, which only an audit of the distributor's own invoices can test, and the gap between a margin and a markup, since a 25% margin is a 33% markup.

  3. Integrated supply, bins and vending

    What is pricedThe parts, plus a storeroom, bins or vending machines that the distributor fills and counts on your site.

    On the recordFastenal reported that 44.8% of its sales in the first nine months of 2026 went through its scanned bins and vending devices, and Grainger runs its KeepStock inventory service on customers' sites.

    What it leaves unpricedWho decides what is stocked and at what level, because the distributor that fills the bins also sells what goes in them.

Each quote is in the Sources below, with its document and date.

Who signs an MRO award, and what each of them needs from the bids

The award is a sourcing decision, and the parts list belongs to maintenance, so six people read the bid tab before anyone signs.

  1. Category manager or indirect sourcing lead

    Owns The event, the parts list sent to bidders and the award recommendation.

    Needs from the bids Every bid in net dollars on the same parts, so the comparison holds up in the steering meeting.

  2. Maintenance manager at each site

    Owns The site's maintenance budget, its work orders and the counter it calls at 2 a.m.

    Needs from the bids Same-day and next-day availability by site, and one contract instead of a dozen local accounts.

  3. Reliability engineer

    Owns The critical-spares list and every form, fit and function call on a substitute part.

    Needs from the bids No substitute ships without approval, and the parts that stop a line sit on a shelf within reach.

  4. Storeroom or MRO inventory lead

    Owns Minimum and maximum levels, bins, vending and cycle counts.

    Needs from the bids What each distributor will stock, where it will sit and who counts it.

  5. Safety manager

    Owns The PPE chosen from the site's hazard assessment.

    Needs from the bids No glove, respirator or eyewear change without the safety manager's approval.

  6. Finance and accounts payable

    Owns The budget, invoice matching and the purchasing-card program.

    Needs from the bids Prices invoiced as bid, a quarterly check on the tail and fewer card purchases.

Five places MRO money leaks after the award, and what Zinit does about each

None of these shows up in a basket comparison, which is why a rebid can look done in the steering meeting and still cost more a year later.

  1. Discounts are compared off lists that belong to each distributor, so the biggest percentage can carry the highest price.

    What Zinit doesEvery bidder prices the same sample of your tail parts in dollars, drawn family by family in proportion to spend, so a discount off list becomes a net price you can set beside the others.

  2. The basket is held for the term while thousands of other parts follow the distributor's list, which moves with every price increase.

    What Zinit doesThe award fixes the whole price file at signing, the tail included, and a fresh sample of tail parts is checked against the invoices each quarter.

  3. Critical spares are bought on price, or not bought at all, until one fails.

    What Zinit doesEach bidder says which of your critical spares it will hold, where and how fast it delivers, and that is scored beside the price.

  4. Parts the contract misses go on purchasing cards and spot orders at whatever the counter quotes.

    What Zinit doesParts outside the contract go out as quick bids to qualified distributors near the site, so a one-off buy still sees more than one price.

  5. The same part sits under two item numbers while dead stock fills the shelves, so its volume is split and the counts drift.

    What Zinit doesZinit groups your item master by manufacturer and part number before the bid, so each part is priced once, and lists for your storeroom team the records that carry no manufacturer part number and the slow movers that are not critical spares.

How Zinit runs an MRO event

Three moves, each one built from your own data, with Zinit's AI agents doing the work and Zinit's procurement people alongside your team.

  1. Build the bid from your parts list

    Zinit reads your item master, a year of invoices and your critical-spares list, then splits them three ways: a basket of top-spend parts priced line by line, a sample of the tail priced in dollars, and a spares lot priced on where each part will sit.

    First RFP in under an hour once the parts list is grouped, and the bids take the time they take.

  2. Widen the field by family

    Broadline distributors bid the whole list, while specialists in bearings and power transmission, electrical, fluid power and safety bid their families and the spares lot, found in a 103M+ supplier and company database and limited to firms that can serve your sites.

    Nobody is invited until your team approves the list.

  3. Level on net price, availability and terms

    Every bid is set in dollars on the same parts, with the spares it will hold and the contract terms it accepts, so the award can split the list wherever a specialist does better.

    Your team directs and approves every award.

Zinit does not hold inventory, run your storeroom or decide which spares are critical. Your reliability engineer decides that, and the award is your team's.

Plant 2's bucket elevator feeds every packing line, and it turns on two bearings the plant buys about once a year.

The worked example: one operator's MRO contract, rebid on its own parts list

Every figure belongs to the example operator, a maker of packaged goods with three plants and two distribution centers, and every money line prints how it was worked out. Zinit is connected to your ERP and your storeroom system, where your team already keeps these records, and your team chooses which ones Zinit reads.

zinit · Example operator · MRO distribution contract

Read from your systems

  • ERPTable Item master: 11,200 active part numbers at five sitessynced
  • Accounts payableCSV Invoices, last 12 months: $18.4M with the incumbent distributorread
  • Storeroom systemList Critical-spares list from reliability engineering: 46 part numberssynced
  • Contract repositoryPDF Current contract: a basket of 400 parts and 33% off list on the restread
From the current contract

Items not listed in Schedule A shall be invoiced at Distributor's then-current list price less the discount stated in Schedule B. Distributor may revise list prices on thirty days' notice.

One list, split into three lots

LotPartsSpend last yearPriced as
Market basket400$9,568,000Net price for each part
Tail10,800$8,832,000The bidder's discount off its own list
Tail check sample150$388,000Net price for each part, so the discount can be read in dollars
Spares lot46—Where each part will sit, how fast it arrives and its price

41 of the 46 critical spares sit outside the basket, so a basket comparison would never have priced them, and 150 tail parts, drawn family by family in proportion to last year's spend, stand in for the other 10,650.

Broadline distributors and specialists, invited

  1. 11Distributors found that serve all five sites or the spares families
  2. 6Met the screens your team set
  3. 5Invited, with the incumbent
  4. 4Bid the list or the spares lot

Screens your team set

  • A branch or stocking location within 60 miles of each site
  • Next-day delivery to all five sites
  • Authorized by the maker for the bearing and power-transmission lines bid
  • No substitute ships without the reliability engineer's approval

Asked for in every bid

  • Net prices for the 400 basket parts and the 150 check parts
  • The discount off list for the tail, with the list as a dated file
  • Which critical spares the bidder will stock, where, how fast, and the service level it will sign for them
  • Freight, emergency delivery and counter charges
  • Fees for bins, vending or an on-site store, if offered

Bidder C, a regional broadline distributor, and Bidder D, a bearings and power-transmission specialist with branches near each plant, the nearest 22 miles from plant 2, were added by Zinit. Nobody was contacted until your team approved the list.

Bids leveled on the same parts

Bidder AIncumbent, national broadlineBidder BNational broadlineBidder CRegional broadline, added by Zinit
Market basket, 400 parts$9,180,000$8,960,000$9,070,000
Headline discount off its own list33%45%38%
Its list price for the 150 check parts$538,806$698,182$567,742
Check sample, 150 parts, net$361,000$384,000$352,000
Check sample against today−7.0%−1.0%−9.3%
Tail at that rate$8,217,402$8,740,948$8,012,536
Leveled year$17,397,402$17,700,948$17,082,536
Critical spares on a shelf within 4 hours18 of 4611 of 4624 of 46
  1. Bidder AIncumbent, national broadline

    Market basket, 400 parts
    $9,180,000
    Headline discount off its own list
    33%
    Its list price for the 150 check parts
    $538,806
    Check sample, 150 parts, net
    $361,000
    Tail at that rate
    $8,217,402
    Leveled year
    $17,397,402
    Critical spares on a shelf within 4 hours
    18 of 46
  2. Bidder BNational broadline

    Market basket, 400 parts
    $8,960,000
    Headline discount off its own list
    45%
    Its list price for the 150 check parts
    $698,182
    Check sample, 150 parts, net
    $384,000
    Tail at that rate
    $8,740,948
    Leveled year
    $17,700,948
    Critical spares on a shelf within 4 hours
    11 of 46
  3. Bidder CRegional broadline, added by Zinit

    Market basket, 400 parts
    $9,070,000
    Headline discount off its own list
    38%
    Its list price for the 150 check parts
    $567,742
    Check sample, 150 parts, net
    $352,000
    Tail at that rate
    $8,012,536
    Leveled year
    $17,082,536
    Critical spares on a shelf within 4 hours
    24 of 46

Tail at that rate = $8,832,000 of tail spend × the check sample's net price ÷ $388,000, its cost today

Bidder B quoted the lowest basket and the biggest discount, and its list prices for the same 150 parts ran 30% above Bidder A's, so its tail costs the most. The sample is drawn at random within each product family, in proportion to its spend, and a fresh one is checked against invoices each quarter after the award.

The spares lot: where each critical part will sit

Who holds itCritical sparesDelivery to the sitePrice for those parts, a year
Bidder C, at its branch24Within 4 hoursIn its list bid
Bidder D, bearings and power transmission17Within 3 hours$26,900
Your own storeroom (two motors, three drives)5On site—
46 critical spares46

Bidder D holds two of the 22220 bearings on its shelf, 22 miles from plant 2. Bidder C's price for D's 17 parts was $28,100 a year against D's $26,900, and both are below the $29,400 the parts cost today.

The award, and the year after it

Award, the listBidder C for the market basket and the tail

The lowest leveled year, and 24 of the critical spares within four hours of a site.

Award, the spares lotBidder D for 17 bearings and power-transmission spares

Held on the shelf at its branches, within three hours of each plant, at its bid prices. The reason is the shelf rather than the $1,200 a year, since one stop last March cost $573,580.

  1. Leveled year, Bidder C$17,082,536
  2. Less C's price for D's 17 parts−$28,100
  3. Plus D's price for them+$26,900
  4. The year after the award$17,081,336
Against $18.4M today, the year costs $1,318,664 (7.2%) less, and the critical spares within reach go from 18 to 41.

Awarding on the basket alone would have picked Bidder B, whose leveled year comes to $17,700,948, $619,612 more than this award.

Start with your parts list

VERIFIED BENCHMARKS

Proven savings across MRO Procurement Optimization

Category / LeverSavings Range
Industrial parts and components12-20%
Safety and PPE supplies10-18%
Facility maintenance supplies12-22%
Tools and equipment10-16%
MRO service contracts15-25%
Cleaning and hygiene supplies12-20%
Emergency purchase premium reduction (planned contracts)20-40% premium eliminated

What an MRO stop looks like, by kind of operation

The category is the same everywhere, and the part that stops the operation changes with the operation, so the spares lot changes too.

Plants

Who buys Maintenance and reliability at each plant, with indirect sourcing running the contract centrally.

What stops it

  • A line that waits on one part: Siemens' 2024 survey puts an average large plant at 27 hours a month of unplanned downtime, down from 39 in 2019.
  • Drives, gear reducers, bearings and seals on equipment that every line depends on.

Where the event helps

Consumables in the basket and the tail, and the parts that stop lines in the spares lot.

Warehouses and distribution centers

Who buys Facilities and maintenance at each building, usually buying the same consumables as the plants.

What stops it

  • Conveyor and sortation drives, dock equipment and lift-truck parts, most of all in the peak weeks.
  • Stretch film, labels and gloves, which are high spend and rarely critical.

Where the event helps

Film and consumables in the basket, and the conveyor and dock spares held near each building before the peak.

Water, wastewater and power utilities

Who buys Plant superintendents, the storeroom and purchasing, usually under public bid rules.

What stops it

  • Pumps, valves, motors and the spares a treatment plant cannot run without.
  • Chattanooga's city auditor found in 2022 that 79% of a wastewater plant's warehouse parts, worth $1.2 million, had not moved in three years, and that the storeroom did not mark which parts were critical.

Where the event helps

A public bid with the critical list marked, so slow movers can be cleared without clearing the spares.

Fleets and transit

Who buys Fleet managers and the parts room, sometimes run by a distributor as an on-site store.

What stops it

  • A vehicle out of service while a part is found.
  • BART's inspector general found in 2026 that about 75% of purchased items sat unused on its shelves, many for eight years or more, and that card purchases had bought items already in its warehouses.

Where the event helps

On-site parts stores priced as a markup or a margin with the cost base audited, and parts outside the contract bid rather than bought on cards.

Campuses, hospitals and large facilities

Who buys Facilities management, with a purchasing office that often buys through a cooperative contract.

What stops it

  • Air handling, power and life-safety systems.
  • NASA's facilities maintenance directive bases what is stocked on historical demand, standby spares for critical systems and projected work.

Where the event helps

Filters, lamps and janitorial supplies in the basket, and the parts for critical building systems in the spares lot.

For plant maintenance crews, shutdowns and the manufacturing category map, see the manufacturing hub and its plant-services page.

What the audits, filings and solicitations show, with dates

Each figure is quoted from its source, with the year beside it. Vendor research is marked as such.

  1. $36,000 to $2.3M

    An hour of unplanned downtime at a large plant, from consumer goods to automotive.

    Siemens, The True Cost of Downtime 2024, a predictive-maintenance vendor's survey of 181 interviews (2019 to 2023)

  2. 27 hours

    A month lost to unplanned downtime at an average large plant, down from 39 in 2019.

    Siemens, The True Cost of Downtime 2024 (vendor survey)

  3. 79%

    Of a city wastewater plant's warehouse parts, worth $1.2 million, with no movement in three or more years.

    City of Chattanooga Office of Internal Audit, March 2022

  4. 75%

    Of a transit agency's purchased items unused on its shelves, across an inventory of 18,000 unique parts.

    BART Office of the Inspector General, August 2026

  5. 93%

    Of a public utility warehouse's 3,602 items with no maximum stock level set.

    City of Richmond Office of the City Auditor, October 2024

  6. 35 of 40

    Price points a multi-state MRO solicitation gave the market basket, with 5 for the discount off list.

    NASPO ValuePoint RFP DASPS-2183-17, November 2017

  7. 5% to 89%

    The discount off one distributor's own reference price across the 811 items of its public-contract hot list.

    Grainger price information for Sourcewell contract 091422-WWG (2022), counted by Zinit

  8. ~7%

    The share held by the largest MRO distributor, in a market MSC counts at about 145,000 US distributors.

    Grainger investor presentation, September 2025; MSC investor presentation, fiscal 2025, citing MDM Analytics

A wholesale price index tracks margins rather than prices, so the dashed line in the chart above is the margin distributors earn, a different thing from what the goods cost them.

MRO families, and the distributors that sell them

A broadline distributor can bid the whole list, while a specialist often does better on its own family and its spares, so the event invites both.

Broadline industrial supplies

Breadth and next-day delivery to every site, usually priced as a basket plus a discount off list.

Distributors
  • Grainger
  • Fastenal
  • MSC Industrial Supply
  • McMaster-Carr

Bearings and power transmission

Genuine parts from a source the maker stands behind, and a branch near the plant; the bearing makers' association tells buyers to buy from trusted sources and lists each maker's authorized distributors.

Distributors
  • Motion
  • Applied Industrial Technologies
  • BDI

Electrical and automation

Drives, controls and wire bought by exact catalog number, with the controls engineer approving any change.

Distributors
  • Wesco
  • Graybar
  • Sonepar

Fluid power and hose

Hose assemblies built to length close to the site, and pumps, valves and cylinders matched to the system they go back into.

Distributors
  • Applied Industrial Technologies
  • Motion
  • Singer Industrial

Safety and PPE

PPE that the employer selects from its own hazard assessment under 29 CFR 1910.132, so the safety manager approves any substitute.

Distributors
  • Airgas
  • Magid

Established suppliers in each category, shown to illustrate the market, not as a list of Zinit's customers or partners.

One result across procurement categories, and the companies RFPs were published from

A manufacturing customer's result and the logo row from the homepage, both as the rest of the site shows them. The ranges above are benchmarks, and we have no MRO-only customer case to show yet.

Manufacturing

23% savings across procurement categories

An industrial manufacturer's events across its indirect categories. The customer is not named.

RFPs published from

  • Magna
  • Avery Dennison
  • Carlsberg Group
  • Ucell
  • JD
  • Cargill

As shown on the homepage.

Questions an MRO buyer asks first

What does it cost?

Zinit is supplier-funded and free to buyers: only the supplier your team selects as the winner pays a commission, the losing bidders pay nothing, and nothing is owed until you award. The commission rates are published openly on our site, and because the fee is tied to the award your team makes rather than to who competes, Zinit earns the same whichever qualified supplier you choose.

Won't a distributor just add your fee back into its prices?

A distributor can, and it would show in the prices it quotes on your own parts list, since those are what the leveled year adds up. Under the fee schedule in Zinit's terms of service, the example's award to Bidder C, $17.05M for the year, carries a $5,000 flat fee plus 0.03% of the RFP volume, about $10,100 once, which is about 90 cents for each of the 11,183 part numbers it takes. Bidder D pays its own on the spares lot, about $227 on $26,900, because each winner's fee is worked out on its own award. If your team would rather keep all of it out of the bids, the same terms let the buyer elect to carry the fee when the RFP is published.

We already have a national MRO contract. Why bid it?

Keep it if it wins. The event prices your own parts list against it, with the incumbent invited, so your team either renews at the price the bids set or moves the families where another distributor does better.

Can a specialist bid only part of the list?

Yes. Bearings and power-transmission, electrical, fluid power and safety specialists can bid their families and the spares lot, and the award can split the list by family.

Can a regional distributor cover all our sites?

Only bidders that meet your coverage screens are invited, such as a branch within 60 miles of each site and next-day delivery to all of them, and the award can split the list by region as well as by family.

Does the award change how our plants order?

No. Each awarded distributor's prices become a price file your team loads into the ERP and the punchout catalog as it does today, and orders, EDI and vending run as before.

Who approves a substitute part?

Your reliability engineer for anything mechanical or electrical, and your safety manager for PPE. Every bid names the manufacturer and part number it quotes, and no substitute is accepted without that approval.

Will this replace our vending machines or the on-site store?

No. Bins, vending and on-site stores are priced inside the bid as a fee, a markup or a margin, so the cost of the service sits beside the parts, and each bid says how the bins and their stock would change hands if the award moves. Your team decides whether to keep them.

What do the distributors see?

Only what your team approves: the part numbers, quantities, delivery sites and the spares lot. Your invoices and today's contract prices stay with your team.

What does Zinit not do?

It does not hold inventory, run storerooms, make parts or decide which spares are critical, and it does not hold the distributor contract, which your team signs directly with each awarded distributor. It does not replace your ERP, your storeroom system or your distributors' counters.

Start with the parts list you bought last year

Bring the item master, a year of invoices and the critical-spares list. Zinit builds the basket, the tail sample and the spares lot from them and runs the event, with your team directing and approving every step.

Sources

  1. [1] State of Oregon for NASPO ValuePoint, RFP DASPS-2183-17, Facilities Maintenance and Repair & Operations (MRO), Industrial Supplies (November 15, 2017)Price scored out of 40 points: 35 for the market basket, 5 for the percentage off list; the discount held for the life of the agreement; catalog orders beyond the basket; forced substitutions not allowed; a pricing audit policy asked of each offeror
  2. [2] Sourcewell, RFP 091422, Facility MRO, Industrial, and Building-Related Supplies and Equipment (proposals due September 14, 2022)A percentage discount from catalog defined as a discount from a published MSRP; line-item pricing shows the published list price beside the contract price
  3. [3] Grainger, price information for Sourcewell contract 091422-WWG, Hot List (2022)811 items, each with a contract reference price and a contract price; the discount runs from 5% to 89%, median 50% (counted by Zinit)
  4. [4] Sourcewell, pricing for NAPA Integrated Business Solutions contract 090624-GPC (2024)On-site inventory priced at a 10% gross margin, an 11% markup over acquisition cost, or at cost with a management fee for a 10% return
  5. [5] Fastenal Company, 2026 third quarter earnings release (October 2026)Product pricing added about 240 basis points to net sales in the quarter; FMI sales were 44.8% of sales in the first nine months of 2026, with 143,878 weighted bins and vending devices installed
  6. [6] Fastenal Company, 2025 annual and fourth quarter earnings release (January 20, 2026)Product pricing added 310 to 340 basis points to net sales in the fourth quarter of 2025, against no material impact a year earlier
  7. [7] W.W. Grainger, Inc., 2025 Annual Report on Form 10-KKeepStock inventory management on customers’ sites; about 2 million products in the high-touch business; next-day delivery from its distribution centers
  8. [8] W.W. Grainger, Inc., investor presentation (September 2025), slide 11Largest MRO player with about 7% share; current addressable market about $199 billion (company estimates as of June 30, 2025)
  9. [9] MSC Industrial Direct, general investor presentation, fiscal 2025 Q2 (citing MDM Analytics)About 145,000 distributors in the US; the top 50 hold about 33% of the market; about $215 billion of the North American MRO market addressable by MSC
  10. [10] Siemens (Senseye Predictive Maintenance), The True Cost of Downtime 2024An hour of unplanned downtime at a large plant: $36,000 in consumer goods, $2.3 million in automotive; 27 hours a month lost at an average large plant, down from 39 in 2019; 181 interviews, 2019 to 2023 (vendor research)
  11. [11] Pacific Northwest National Laboratory for the US DOE Federal Energy Management Program, O&M Best Practices glossaryCritical spares: high-value or long-lead-time parts usually carried in stock to prevent excessive downtime in a breakdown
  12. [12] NASA, NPR 8831.2F, Facilities Maintenance and Operations Management, section 5.7.2.2Stock based on historical demand, standby items (spares for critical systems) and projected work, with limits from use rates and delivery times
  13. [13] City of Chattanooga Office of Internal Audit, Performance Audit 21-06: Moccasin Bend Inventory (March 2022)79% of warehouse parts, valued at $1.2 million, with no movement in three or more years; the storeroom did not categorize critical parts
  14. [14] City of Richmond Office of the City Auditor, OCA 2025-03, DPU Main Warehouse (October 8, 2024)93% of 3,602 inventory items with no maximum level, 26% with no minimum, 23% with no reorder point
  15. [15] BART Office of the Inspector General, Strengthening BART Inventory and Purchasing Through Better Coordination and Compliance (August 6, 2026)About 75% of purchased items unused on shelves, many for eight years or more; $118 million of inventory across 18,000 unique parts; card purchases of items already in its warehouses
  16. [16] 29 CFR 1910.132, Personal protective equipment, general requirements (Cornell LII)The employer assesses hazards and selects the PPE that protects employees from them
  17. [17] World Bearing Association, Stop fake bearingsBuy from trusted sources; each member maker lists its authorized distributors
  18. [18] US Bureau of Labor Statistics, producer price indexes for eight MRO product industries, not seasonally adjusted (January 2020 and September 2026, preliminary)PCU332912332912, PCU333613333613, PCU332722332722, PCU332911332911, PCU335312335312, PCU332991332991, PCU332216332216, PCU326220326220
  19. [19] US Bureau of Labor Statistics, PPI for machinery, equipment, and supplies merchant wholesalers, PCU4238--4238--102.3 in January 2020, 157.541 in September 2026 (preliminary)
  20. [20] US Bureau of Labor Statistics, Handbook of Methods, Producer Prices: ConceptsPPIs for wholesale and retail trade track changes in the gross margins wholesalers and retailers receive
  21. [21] McMaster-CarrBroadline industrial supplies catalog
  22. [22] Motion, Bearings and HydraulicsBearings, power transmission and hydraulics distribution (read on an Internet Archive capture)
  23. [23] Applied Industrial TechnologiesBearings, power transmission and fluid power distribution for MRO and OEM customers (read on an Internet Archive capture)
  24. [24] Bearing Distributors, Inc. (BDI)Bearings and mechanical power transmission
  25. [25] WescoElectrical, automation and supply chain services (read on an Internet Archive capture)
  26. [26] Graybar, Industrial Control and AutomationIndustrial control and automation products
  27. [27] SoneparBusiness-to-business distribution of electrical products
  28. [28] Singer IndustrialIndustrial hose, hydraulic hose and fluid power distribution
  29. [29] Airgas, Safety ProductsSafety products alongside gases and welding supplies
  30. [30] Magid Glove & SafetyWork gloves and industrial PPE
  31. [31] Zinit, Terms of Service, Schedule 1, Service Fee Schedule (effective July 28, 2026)the published supplier fee: flat fee plus a share of the RFP volume, by band; the buyer may elect to carry it when the RFP is published

Related research

  • Critical-materials exposure by category

    Keep DOE definitions, USGS methodology and final list editions distinct when mapping critical materials to your own items, applications and category records.

Related procurement resources

Request a demo
Request a demo