Freight Fuel Surcharge Index Governance: Pegs, Lags and Invoice Audits

A diesel pump with a blank display and its nozzle in the holster at a truck fueling island at dusk, a white tractor-trailer parked beside the next pump under the canopy lights.
“A fuel surcharge schedule is a price formula the buyer pays every week, so each input it reads should be written down, dated and checkable on the invoice.”
— Stan Moskovtsev, Co-Founder & U.S. CEO
Dated records behind an awarded fuel surcharge schedule
StatisticSource
Week of 11/09/26: on-highway diesel at 6.127 dollars per gallon (U.S.), 5.741 (Gulf Coast, PADD3) and 7.110 (West Coast, PADD5), taxes included.EIA weekly diesel release, 2026
Truckload contract base rates exclude fuel; a separate surcharge follows a benchmark, and contracts are often set a year before fuel prices are known.Balthrop and colleagues, Logistics, 2025
Estimates are published around 10:00 a.m. ET on Tuesday (Wednesday after a government holiday) and withheld when outlets with imputed prices carry at least half of weighted volume.EIA diesel price methodology, 2022
Week of June 20, 2022: system errors delayed EIA data releases, including the weekly diesel prices.Land Line news report, 2022
2013 rail complaint: surcharge revenue exceeded incremental fuel costs by $181 million against actual fuel spend, but not against the safe-harbor index.Surface Transportation Board notice, 2019

Dated records from different series, markets and legal regimes; none is a benchmark peg, rate or efficiency constant.

What should an awarded fuel surcharge schedule fix?

In truckload contract markets, according to a 2025 peer-reviewed study of fuel cost pass-through, base rates exclude fuel, a separate surcharge follows a benchmark such as an EIA index, and agreements are often set a year before fuel prices are known. In the same study, the shipper therefore bears the fuel price risk, paying the surcharge in force when the load is tendered.

Bid-stage questions, including what the EIA weekly series measures and where it stops, are covered in the method for making freight-lane bids comparable, which this guide does not repeat. In this guide's view, the signed schedule needs seven terms: peg, step and rounding, efficiency constant or percentage table, index week and geography, missing-release rule, charge base, and audit and dispute rules.

How should the peg relate to the linehaul rate?

In the 2025 study's account of contract pricing, contract language separates base rates from fuel costs, yet in practice rates and surcharges are jointly determined. According to the Surface Transportation Board's 2007 reporting rule, one commenter asked for data on misaligned surcharge thresholds, where the surcharge's base fuel price sits below the fuel cost in the rail rate, so the carrier double-dips; the Board did not add that item.

According to a 2012 peer-reviewed case study in Interfaces, a large US shipper saw an unexpected jump in fuel surcharges when diesel prices spiked in summer 2008. In that case study, a lane assignment tool then let it weigh base price against risk-adjusted fuel surcharge, negotiate surcharge limits that share diesel price risk and better align surcharges with the true cost of diesel.

In this guide's view, ask each carrier which fuel price its linehaul already assumes, then set the peg at that level or reprice the linehaul when the peg moves. If the linehaul also escalates by an index that contains fuel, apply the rules for an auditable contract escalation clause so that one fuel move is not paid twice.

How should steps and the efficiency constant be written?

According to the Surface Transportation Board's 2019 safe-harbor notice, the Board found in 2007 that rate-based surcharges on regulated rail traffic, with no real correlation to the movement's added fuel cost, were an unreasonable practice, and it prohibited surcharges set as a percentage of the base rate. In the same notice, regulated rail surcharge programs must rest on movement attributes, such as mileage, that directly affect the fuel consumed.

Under the Board's 2007 reporting rule, that ruling applies only to regulated rail traffic, so it does not govern a truckload or less-than-truckload contract. In this guide's view, its test still helps: a percentage-of-linehaul table moves with the rate, not with miles or gallons, so record why a lane uses one and recheck it when linehaul rates change.

Fuel use per mile varies: in the 2025 study, route, equipment configuration, cargo weight, vehicle fuel economy, elevation and traffic all shape consumption, and the authors' per-mile estimates are sensitive to the fuel efficiency they assumed. In this guide's view, write the efficiency constant as a dated term per equipment type and review it on a fixed date.

Under EIA's published methodology, each weekly average price has an estimated standard error in a separate report, and an estimate is flagged when its coefficient of variation exceeds 5%. In this guide's view, check the published standard error before choosing a narrow step, and state the step width, rounding and whether the table moves the same way up and down.

Which index week and region should an invoice use?

According to EIA's survey method, prices are collected as of 8:00 a.m. local time on Monday and published around 10:00 a.m. ET on Tuesday, or on Wednesday after a government holiday while still representing Monday's prices. Under the same method, EIA publishes national, regional and California averages.

In EIA's release of November 10, 2026, the week of 11/09/26 shows 6.127 dollars per gallon for the U.S., 5.741 for the Gulf Coast and 7.110 for the West Coast. In this guide's view, name the series and geography, tie the index week to one shipment date such as tender or pickup, and state when each value takes effect.

In this guide's view, date every schedule input, applying the discipline of checking freight forecast editions and their assumptions to the contract, so an auditor can trace each invoice's inputs.

What should happen when a weekly diesel price is late or missing?

Under EIA's methodology, prices for outlets that cannot be reached are imputed, and an average is withheld when at least half of the weighted annual sales volume rests on imputed prices. In June 2022, according to a Land Line news report, hardware-related system errors delayed EIA's releases for the week of June 20, including weekly diesel prices, and EIA planned to release the delayed data as soon as possible.

In this guide's view, state which value applies when a week's figure is late or withheld (for example, the last published week), whether a later release triggers a true-up, and which substitute applies if the series is discontinued or renamed. Apply the rule the same way whether prices rose or fell.

How should fuel surcharge invoices be audited and disputed?

In a 2013 rail complaint recounted in the Surface Transportation Board's 2019 notice, BNSF's surcharge revenue over five years exceeded its incremental fuel costs by $181 million measured by what it actually paid for fuel, but not measured by the safe-harbor index, and the complaint was dismissed. In this guide's view, the contract should define what counts as correct and keep any comparison with actual fuel use as a separate review.

Under the Board's 2007 rule on fuel surcharge reporting, Class I railroads report fuel cost, gallons consumed, the change in fuel cost and surcharge revenue each quarter, counting revenue billed rather than collected. In the same rule, aggregated data serve as a monitoring tool, not a substitute for evidence in an individual case. In this guide's view, a buyer can mirror that by comparing each lane's surcharge billed with the fuel implied by miles and the constant.

In the 2009 edition of Title 49 of the US Code, a motor carrier must give a shipper, on request, the rate, rules and practices behind its rate, and each side faces a 180-day limit: a carrier to bill extra charges, a shipper to contest a bill. Under section 14101 of that edition, contract parties may expressly waive these rights in writing, and breach claims go to court unless they agree otherwise.

In this guide's view, write the audit and dispute rules into the schedule: the fields each invoice must carry, the recalculation tolerance, the dispute window and who decides. Ask counsel to confirm the current statute and any waiver before relying on a deadline.

Which terms should the surcharge schedule record?

The register below is this guide's proposal; every value it asks for is the parties' contract term, not a market norm.

A proposed register of fuel surcharge schedule terms and audit checks
TermWhat the contract statesAudit check
IndexSeries, publisher, geography and unitInvoice names the same series and geography
Index weekShipment date that selects the week, effective dayEach shipment maps to one published week
Late or withheld valueFallback week, true-up, substitute seriesFallback applied the same way up or down
PegBase price, effective date, fuel in the linehaulPeg matches the signed version
Step and roundingStep width, rounding, any cap or sharing limitRecalculation matches the bill within tolerance
Efficiency constant or tableConstant per equipment type, or table versionInvoice uses the contracted constant or table
Charge baseMileage source or linehaul amount; excluded chargesNo surcharge on excluded charges
Escalation overlapWhether a linehaul escalation index contains fuelFuel recovered through one mechanism only
Quarterly reviewSurcharge billed against fuel implied by milesVariances explained, not netted against invoices
DisputeRecords, window, decision owner, any waiverDisputes logged in the window with the recalculation

Proposed by this guide; it sets no values and is not a market standard.

How do AI agents change fuel surcharge audits?

Frequently asked questions

Does a fuel surcharge have to be a percentage of the linehaul rate?

No. According to the Surface Transportation Board's 2019 notice, percentage-of-rate surcharges on regulated rail traffic were prohibited in 2007. For truckload or less-than-truckload carriage, under section 14101 of the 2009 edition of Title 49, carriers and shippers may contract for specified services at specified rates and conditions, so the formula is their own term; ask counsel to confirm the current text.

Which week's diesel price should a fuel surcharge invoice use?

The week the schedule names. Under EIA's survey method, Monday's prices are published on Tuesday, or on Wednesday after a government holiday, so tie each tender or pickup date to one published week and state when the new value takes effect.

How long does a shipper have to dispute a carrier's fuel surcharge?

Check the contract first. In the 2009 edition of Title 49, a shipper must contest a motor carrier's bill within 180 days of receipt to keep the right to contest it, but contract parties may expressly waive such rights in writing. Ask counsel to confirm the current text.

Sources

  1. Rail Fuel Surcharges (Safe Harbor) — Surface Transportation Board, Surface Transportation Board, Docket No. EP 661 (Sub-No. 2); Federal Register notice 2019-19053, 84 FR 46602-46604, published 4 September 2019 (decided 28 August 2019); read on federalregister.gov, 2019. Historical evidence (official report): Definition of a fuel surcharge as a separately identified rate component; the 2007 finding that rate-based surcharges on regulated rail traffic are unreasonable, the prohibition of surcharges expressed as a percentage of the base rate and the direction to use movement attributes such as mileage; the Cargill v. BNSF observation that internal fuel costs and the safe-harbor index gave different over-recovery answers; discontinuance of the docket.
  2. Carbon Pricing and the Truckload Spot Market — Andrew Balthrop; Justin T. Kistler; Yemisi Bolumole; Alex Scott; Chad W. Autry (University of Tennessee), Logistics 9(3):121, MDPI, published 28 August 2025 (received 16 July 2025, accepted 22 August 2025); DOI 10.3390/logistics9030121; read from Internet Archive capture 20260330175438 of the article page, 2025. Current empirical evidence (peer reviewed journal): Contract-market structure (base rates exclude fuel, a separate surcharge follows a benchmark, contracts set before fuel prices are realized, shipper bears fuel risk at tender); rates and surcharges jointly determined in practice; carriers buying fuel at discounted site-specific or bulk wholesale prices; route, equipment, cargo weight, fuel economy, elevation and traffic as fuel-use factors; dependence of the per-mile estimates on the assumed fuel efficiency.
  3. A Large US Retailer Selects Transportation Carriers Under Diesel Price Uncertainty — John Turner; Ben Peterson; Soo-Haeng Cho; Sunder Kekre; Alan Scheller-Wolf, Interfaces 42(4):365-379, August 2012 (INFORMS); DOI 10.1287/inte.1110.0610; abstract read from the publisher-deposited Crossref record, 2012. Foundational evidence (peer reviewed journal): An unexpected jump in fuel surcharges at a large US shipper in summer 2008; base price and risk-adjusted fuel surcharge as the two parts of lane cost; negotiating fuel surcharge limits to share diesel price risk; aligning surcharges paid with the true cost of diesel.
  4. Rail Fuel Surcharge Reporting (final rule, STB Ex Parte No. 661 (Sub-No. 1)) — Surface Transportation Board, Federal Register Vol. 72, No. 156, 14 August 2007, pp. 45384-45386 (FR Doc. E7-15863), official PDF on govinfo.gov; decided 8 August 2007, effective 12 November 2007, 2007. Foundational evidence (official report): The report's line items (fuel cost, gallons consumed, change in fuel cost, surcharge revenue) and revenue billed rather than collected; aggregated data as a monitoring tool, not a substitute for evidence in an individual case; the 2007 rate-based ruling applying only to regulated traffic; shipper requests for a single fuel index, one objective source of miles and data on misaligned surcharge thresholds (double-dipping), which the Board did not add.
  5. Methodology for EIA Weekly On-Highway Diesel Fuel Price Estimates — U.S. Energy Information Administration, U.S. Energy Information Administration, U.S. Department of Energy; methodology of the sample implemented 13 June 2022; page read 12 November 2026 (header: Diesel Fuel Release Date November 10, 2026), 2022. Foundational evidence (official report): Monday 8:00 a.m. local observation; publication around 10:00 a.m. ET Tuesday, or Wednesday after a government holiday while still representing Monday's prices; national, regional and California estimates; imputation for outlets not reached and withholding when at least half the weighted volume is imputed; published standard errors and the 5% coefficient-of-variation flag.
  6. Gasoline and Diesel Fuel Update — U.S. Energy Information Administration, U.S. Energy Information Administration; diesel release of 10 November 2026 (next release 17 November 2026); page read 12 November 2026, 2026. Current empirical evidence (official report): Release and next-release dates; the US, Gulf Coast (PADD3) and West Coast (PADD5) values for the week of 11/09/26, showing that the named geography changes the observation.
  7. System errors delay EIA diesel reports — SJ Munoz, Land Line (media of the Owner-Operator Independent Drivers Association), 23 June 2022, 2022. Historical evidence (news): A dated instance of a delayed EIA weekly diesel release (week of June 20, 2022) caused by hardware-related system errors, with the delayed data to follow as soon as possible.
  8. United States Code, 2009 Edition, Title 49, Subtitle IV: Interstate Transportation (sections 13710 and 14101) — United States Congress (United States Code, published by the U.S. Government Publishing Office), U.S. Government Publishing Office, United States Code 2009 edition, Title 49, Subtitle IV, on govinfo.gov, 2009. Historical evidence (official report): Shipper's right to request the rate, rules and practices on which a rate is based; 180-day windows for carriers to bill additional charges and for shippers to contest bills; written express waiver of rights and remedies in contracts and the court remedy for breach unless the parties agree otherwise.

Global Procurement Brief

Procurement news, briefed

The market moves, supplier signals, and cost levers that matter — curated by the team behind this Journal. Daily or weekly, your call.

We respect your privacy. No spam. Your data is never sold.

Related procurement resources

Request a demo
Request a demo