Critical Mineral Sourcing and Export Control Due Diligence

A daylit incoming-materials inspection bay with sealed glass sample jars of grey mineral powders and a tray of small metal pellets on a steel table, a closed folder beside them, and sealed steel drums and white bulk sacks waiting in two marked lanes behind a pink strap barrier.
“I would tie every controlled mineral to a part number and a named refiner before the next pause ends, because that record is what a category team reaches for on the day a licence stalls.”
— Stan Moskovtsev, Co-Founder & U.S. CEO
Dated controls and findings
StatisticSource
MOFCOM Announcement No. 58 of 2026, November 9, 2026: six October 2025 measures stay suspended until January 10, 2027.The Oregon Group, November 9, 2026
BIS final rule 2026-22793, November 9, 2026: the affiliates rule stays suspended until January 10, 2027.Federal Register via GovInfo, 2026
IEA and OECD survey of 82 companies, late 2025: two-thirds report some traceability system, 30% with full coverage.IEA traceability report, 2026
USGS, February 2026: China, including Hong Kong, supplied 71% of U.S. imports of rare-earth compounds and metals in 2021–24.USGS Mineral Commodity Summaries 2026

Newest first; the MOFCOM row comes from a dated secondary report, not the official Chinese text.

Import sources of U.S. rare-earth compounds and metals, 2021–24
  • China and Hong Kong71%
  • Malaysia13%
  • Japan5%
  • Estonia5%
  • Other countries6%

Shares by import source, as USGS lists them; Hong Kong is counted with China. USGS says the compounds and metals imported from Estonia, Japan and Malaysia were derived from concentrates and intermediates produced in Australia, China and elsewhere. Source: U.S. Geological Survey, Mineral Commodity Summaries 2026, rare earths chapter.

Which export controls apply to the critical minerals supply chain as of November 23, 2026?

According to the European Commission’s Access2Markets barrier record, last updated September 16, 2026, China imposed export controls in April 2025 on samarium, gadolinium, terbium, dysprosium, yttrium, scandium and lutetium, also covering NdFeB magnets containing terbium and dysprosium. Under Announcement No. 58 of 2026, as The Oregon Group reports it, six October 2025 measures, including licences for five more rare earths and lithium battery and graphite anode controls, stay suspended until January 10, 2027.

According to Pillsbury’s summary of the November 2025 announcements, MOFCOM suspended its in-principle refusal of licences for gallium, germanium, antimony and superhard material exports to the United States, and its stricter review of graphite exports there, until November 27, 2026; the ban on dual-use exports to US military users or end uses remains. Under suspended Announcement No. 61, as Pillsbury describes it, foreign-made items with Chinese-origin controlled rare earths worth 0.1% or more of their value would need licences. In The Oregon Group’s report, that rule is one of the six measures suspended until January 10, 2027.

According to Dechert’s November 9, 2026 update, the Commerce Department’s Affiliates Rule would apply licence requirements to foreign entities 50% or more owned by Entity List, Military End-User List or certain sanctioned parties. Under BIS final rule 2026-22793 of November 9, 2026, its amendments stay suspended until January 10, 2027. Ask trade counsel how the rule would treat a supplier affiliate that receives US-origin drawings or tooling.

How do you map parts to export-controlled minerals beyond tier 1?

Screen parts from full material declarations, not drawing specifications that may name only a magnet grade, and flag each controlled element or form. According to the USGS Mineral Commodity Summaries 2026 chapter on rare earths, a significant amount of imported rare earths was embedded in finished goods, and compounds and metals imported from Estonia, Japan and Malaysia were derived from concentrates and intermediates produced in Australia, China and elsewhere. Record the processing country of each step alongside the country of origin.

According to the IEA’s 2026 report on an IEA and OECD survey of 82 companies, traceability coverage typically drops sharply beyond direct suppliers, and confidentiality, weak leverage over suppliers and poor data quality were the most cited obstacles to running such a system. Ask each tier-1 supplier in writing who processed each flagged input and where, and accept “confidential” only with a way to verify it, such as an independent auditor.

A proposed part-level dependency record
FieldQuestion to answerEvidence to holdWho acts if it fails
Controlled inputWhich element and form does the part contain, and is it on a current list?Specification; material declaration; list check dateCategory manager
ProcessorWho separated, refined or made the magnet or anode material, and where?Supplier statement; chain-of-custody recordSupplier quality
LicenceOne-time or general licence, and when does it end?Supplier licence type and end dateTrade counsel
End useDoes the declared end use match the buyer’s use?End-use statement; buyer’s useTrade counsel
Dated pauseDoes the part depend on a control suspended until a stated date?Part list mapped to each pauseCategory owner
FallbackWhere does each candidate source separate and refine, and how long would requalification take?Processor map for each candidate; qualification planCategory owner

This guide’s method, not a legal test; trade counsel decides licensing and end-use questions. A second source that relies on the same Chinese separation or refining stage is not a fallback.

Use the critical materials category taxonomy for list definitions and the mineral import-reliance research for national context.

What chain-of-custody evidence exists for processed rare earths?

According to the final draft text of ISO 23664:2021, the standard specifies what supply chain businesses record for rare earth materials from mine to separated products, gives no guidance on mass balance and does not demand perfect traceability. Under the same draft, the supply chain itself must justify its mass-balance calculations until a mass-balance standard exists. Ask any supplier citing the standard which model it uses and where its scope ends.

In a 2026 study in the journal Standards, chain-of-custody models run from identity preservation and segregation to controlled blending, mass balance, and book and claim, and interviews with 10 supply chain actors found industry capacity lagging regulators’ expectations. According to the IEA survey report, mass balance was the most common model, chosen by about 40% of companies, and it allows some mixing with untraced material. Where a part must prove origin, ask for lot-level records.

Under the OECD’s due diligence Recommendation of 25 May 2011, companies should set up a chain of custody or traceability system, or identify upstream actors, and put a supply chain policy into supplier contracts; its risk scope is human rights abuse, conflict finance and financial crime. According to the Responsible Minerals Initiative’s 2021 announcement, its All Minerals standard applies to upstream actors from processors to mines.

According to Morrison Foerster’s August 2026 analysis, MOFCOM Order No. 2 of 2026 put the Responsible Business Alliance on China’s countermeasure list from August 5, 2026, barring organizations and individuals within China from transactions and cooperation with it, and the firm reads the listing as likely broad enough to capture the Responsible Minerals Initiative. Ask China-based suppliers what other evidence they can provide.

What should suppliers represent on licences, volumes and end use?

According to a July 2025 Freshfields briefing, a force-majeure clause must explicitly cover export restrictions, and buyers may dispute that the 2025 rare earth restrictions were unforeseeable after China’s 2023 gallium and germanium controls. In the same briefing, licence applications may require end-use details that clash with non-disclosure terms, and a buyer withholding needed information may lose a later damages claim. Ask each supplier these questions, and send the answers to trade counsel before any becomes a contract representation:

  • Which licence covers each controlled input, one-time or general, and when does it expire?
  • Which end user and end use did the exporter declare?
  • What quantity does the licence cover, and how would a shortfall be allocated?
  • How much notice will the supplier give of a refusal, delay or revocation, and what cure or termination follows?
  • What must the supplier disclose to the licensing authority, will it limit disclosure to what the authority requires, and will it tell the buyer first?

How long a buffer does a category team need when a pause expires?

According to Pillsbury’s November 2025 analysis, the suspended Chinese licence requirements have only been delayed and formally remain on the books, so companies should prepare for a potential sudden reinstatement when a pause expires or tensions re-escalate. For each mapped part, work back from the date goods must clear Chinese export before the pause ends, then size the buffer to the fastest credible recovery path, either licence review plus transit or second-source requalification and ramp-up, plus any overlapping seasonal shutdown at the source.

Plan any second source with the dual-sourcing guide.

Which government lists and registries should a category team monitor?

According to the Bureau of Industry and Security’s guidance on end-user controls, the Consolidated Screening List combines Commerce, State and Treasury lists, including the Entity List, Unverified List and Military End-User List, and BIS’s list-based restrictions on exports, reexports and transfers generally apply whenever a listed party is a party to the transaction, including the purchaser. Screen each processor in the dependency record against it on a fixed cycle and at every change.

According to SIPRI’s April 2026 backgrounder, China keeps an export control list of entities, a watch list for entities that fail to cooperate with end-user verification, and the Unreliable Entity List. Watch MOFCOM’s announcement list and the Federal Register, dating each reading.

How will AI agents change critical mineral export-control sourcing?

Frequently asked questions

Are China’s rare earth export controls suspended?

Only in part, as of November 23, 2026: according to The Oregon Group’s November 9, 2026 report, the April 2025 licences on seven rare earths were never part of the pause, while six October 2025 measures stay suspended until January 10, 2027.

Is China’s ban on gallium, germanium and antimony exports to the United States in force?

The in-principle refusal is paused as of November 23, 2026: according to Pillsbury’s November 2025 summary, Article 2 of Announcement No. 46 of 2024 is suspended until November 27, 2026, while the ban on dual-use exports to US military users or end uses remains in effect. According to The Oregon Group’s report of November 9, 2026, that suspension is due to end on November 27, 2026, and no extension had then been published.

Is the US affiliates rule in effect?

Not as of November 23, 2026: under BIS final rule 2026-22793, published November 9, 2026, the rule’s amendments are further stayed until January 10, 2027. According to Dechert’s November 9, 2026 update, existing export controls and sanctions requirements remain in effect.

Sources

  1. Rare Earth export controls: China extends pause to January 10 ahead of Trump-Xi talks — The Oregon Group, The Oregon Group (theoregongroup.com), November 9, 2026, 2026. Contextual evidence (news): The publisher is an investment research team focused on critical minerals; Announcement No. 58 of 2026 keeps six October 2025 measures suspended from November 11 until January 10 (2027), in a one-line notice that gave no other details; the six include licences for holmium, erbium, thulium, europium and ytterbium, the rule requiring a Chinese licence for foreign-made rare-earth magnets and targets with 0.1% or more Chinese-origin rare earths by value, and controls on lithium batteries and synthetic graphite anode materials; China's April 2025 licences on seven medium and heavy rare earths were never part of the pause and still require a permit for every shipment; the suspension of the US gallium, germanium and antimony ban is due to end November 27, with no extension published as of November 9, 2026.
  2. China's rare earth curbs strain supply chains — Freshfields LLP, Freshfields briefing, July 16, 2025, 2025. Contextual evidence (practitioner article): A force-majeure clause must explicitly cover export restrictions, a point the buyer may dispute; given China's 2023 gallium and germanium restrictions, buyers may challenge claims that the 2025 restrictions were unforeseeable; suppliers may need to disclose end-use information to Chinese authorities, which could breach non-disclosure obligations; buyers that refuse or delay needed information may be precluded from claiming damages for non-delivery.
  3. Guidance on end-user and end-use controls and U.S. person controls — Bureau of Industry and Security, U.S. Department of Commerce, Bureau of Industry and Security, bis.gov licensing guidance (page last changed April 24, 2026), 2026. Contextual evidence (official report): The CSL consolidates lists maintained by the Departments of Commerce, State and the Treasury and includes the Denied Persons List, Entity List, Unverified List and Military End-User List; the restrictions generally apply when a listed party is a party to the transaction, including applicant, purchaser and consignee.
  4. China’s export control framework: Domestic developments and international positioning — Giovanna Maletta and Fei Su, Stockholm International Peace Research Institute, SIPRI topical backgrounder, 29 April 2026, 2026. Contextual evidence (industry analysis): China restricts dual-use exports to entities on its export control list; the dual-use regulations created a watch list, analogous to the US Unverified List, of entities that failed to cooperate with end-user verification; China established the Unreliable Entity List in 2020.
  5. A Reprieve, Not a Repeal: BIS Extends the Affiliates Rule Pause — Dechert LLP, Dechert OnPoint, November 9, 2026, 2026. Contextual evidence (practitioner article): The rule automatically applies license requirements to foreign entities owned 50% or more, directly or indirectly, individually or in the aggregate, by parties on the Entity List or MEU List, or by certain SDNs; the extension does not repeal or modify the underlying rule.
  6. Extension of the Suspension of Expansion of End-User Controls for Affiliates of Certain Listed Entities (final rule; stay) — Bureau of Industry and Security, U.S. Department of Commerce, Federal Register 91 FR 70789-70790, document 2026-22793, final rule; stay, November 9, 2026 (GovInfo), 2026. Contextual evidence (official report): The suspension was set to end November 9, 2026; the final rule extends it through January 10, 2027; effective November 9, 2026, the amendments to 15 CFR parts 732, 734, 736, 744 and 748 in the affiliates interim final rule are further stayed until January 10, 2027.
  7. Export Restrictions on Raw Materials and Rare Earth Elements (Access2Markets barrier 11028, China) — European Commission, Directorate-General for Trade and Economic Security, European Commission, Access2Markets barrier record 11028, last updated September 16, 2026, 2026. Contextual evidence (official report): In April 2025 China imposed export controls on samarium, gadolinium, terbium, dysprosium, yttrium, scandium and lutetium, also covering NdFeB magnets containing terbium and dysprosium; raw materials under China's export licensing include rare earths, graphite, gallium, germanium, tungsten, indium, cobalt and magnesium.
  8. China Suspends Export Controls on Certain Critical Minerals and Related Items — Pillsbury Winthrop Shaw Pittman LLP, Pillsbury Winthrop Shaw Pittman LLP client alert, November 13, 2025, 2025. Contextual evidence (practitioner article): Article 2 of Announcement No. 46 of 2024 (licences for gallium, germanium, antimony and superhard materials to the United States not approved as a principle; stricter graphite end-user and end-use review) suspended from November 9, 2025 until November 27, 2026; the prohibition on dual-use exports to US military users or end uses remains in effect; suspended Announcement No. 61 would reach foreign-produced items with Chinese-origin controlled rare earths of at least 0.1% of value; the regulatory triggers have only been delayed and formally remain on the books, so companies should prepare for reinstatement when a pause expires.
  9. Rare Earths, in Mineral Commodity Summaries 2026 — Shelby N. Johnston, U.S. Geological Survey, U.S. Geological Survey, Mineral Commodity Summaries 2026 (February 2026), rare earths chapter, pp. 152-153, 2026. Current empirical evidence (official report): Import sources (2021-24) of U.S. rare-earth compounds and metals: China (including Hong Kong) 71%, Malaysia 13%, Japan 5%, Estonia 5%, other 6%; compounds and metals imported from Estonia, Japan and Malaysia were derived from mineral concentrates and chemical intermediates produced in Australia, China and elsewhere; a significant amount of imported rare earths was embedded in finished goods.
  10. Critical Mineral Traceability for Energy and Economic Security — International Energy Agency (lead authors Félix Gagnon, Alexandra Hegarty and Joyce Raboca), International Energy Agency, 2026 (CC BY 4.0), 2026. Current empirical evidence (official report): Two-thirds of respondent companies report some traceability system, 30% with full coverage and 40% across selected minerals or supply chains; coverage typically drops sharply beyond companies' direct suppliers; the main obstacles to maintaining and operating a system are business confidentiality (46%), limited leverage over suppliers (40%) and limited data quality or credibility (32%); mass balance is the most common model (about 40%), followed by identity preservation (28%); mass balance and controlled blending allow varying degrees of mixing with untraced material.
  11. Insights from Industry Actors on Chain-of-Custody Implementation in the Mineral Supply Chains — Thania Nowaz, Samuel Olmos Betin, Lukas Förster, Paulina Fernandez, Daniel Monfort, Oscar Jaime Restrepo Baena, Michael Tost and Helmut Mischo, Standards 6(3): 34, 2026 (MDPI), doi:10.3390/standards6030034, 2026. Current empirical evidence (peer reviewed journal): Chain-of-custody models include identity preservation, segregation, controlled blending, mass balance, and book and claim; interviews with 10 actors (June to September 2025) found a gap between what regulatory bodies expect and industry actors' capacity to implement such a system.
  12. ISO/FDIS 23664:2021 Traceability of rare earths in the supply chain from mine to separated products (final draft, sample pages) — ISO/TC 298, Rare earth, International Organization for Standardization, ISO/FDIS 23664:2021 final draft sample (iTeh Standards); ISO 23664:2021 published 25 October 2021, 2021. Foundational evidence (official report): The standard specifies the information supply chain businesses record for rare earth materials from mine to separated products; it does not provide guidance on mass balance; until a mass-balance standard exists, the rare earth supply chain must provide the framework and justification for its mass-balance calculations; it does not demand perfect traceability.
  13. Recommendation of the Council on Due Diligence Guidance for Responsible Supply Chains of Minerals from Conflict-Affected and High-Risk Areas (OECD/LEGAL/0386) — OECD Council, OECD Legal Instruments, OECD/LEGAL/0386, adopted 25 May 2011, 2011. Foundational evidence (official report): Adopted by the OECD Council on 25 May 2011; companies should establish a chain of custody or a traceability system or identify upstream actors, and incorporate a supply chain policy into contracts or agreements with suppliers; the risk scope covers serious human rights abuses, conflict finance and financial crime.
  14. Responsible Minerals Initiative Releases New Global Standard for All-Minerals Due Diligence — Responsible Minerals Initiative, Responsible Business Alliance, Responsible Business Alliance news release, December 15, 2021, 2021. Contextual evidence (industry analysis): The All Minerals standard applies to all upstream actors in mineral supply chains, from processors to traders to mining operations; assessments under the RMAP programme from 2022.
  15. MOFCOM Places the Responsible Business Alliance on China’s Countermeasure List: Considerations for Companies Relying on RBA Audits in China — Morrison & Foerster LLP, Morrison Foerster client alert, August 21, 2026, 2026. Contextual evidence (practitioner article): Order No. 2 of 2026 took effect August 5, 2026, placing six U.S. entities including the Responsible Business Alliance on China's countermeasure list; the countermeasure prohibits organizations and individuals within China from transactions, cooperation and other activities with the listed entities; the listing is likely broad enough to capture the Responsible Minerals Initiative, in the firm's reading.

Global Procurement Brief

Procurement news, briefed